AFRC DC-8:
Work on instruments continues in preparation for the #2 instrument flight on Thursday.
Shipping coordination Continues. If you have not spoken with Steven Todorov do so ASAP.
KORUS Plan for Tuesday 4/19 - AFRC DC-8 4/19: Tuesday
0700-1700 Aircraft and Lab Access
All flyers expecting to be on the Thursday Test Flight #2 contact Jack Dibb by 0900.
Those who have not had egress training need to accounted for.
PLAN FOR 4/15: Friday: 0700-1200: DC-8 outside
Engine Run
Pressurization check
Wt / Balance - (Aircraft Inside Hangar) PI tool boxes in overhead to be included for Wt/Balance
1200-1400 Aircraft Pre-Flight
1400-1530 Engineering flight
1600-1700 Post-flight inspection
(Very Limited access)