Synonyms: 
KORUS-AQ (HL 5200)
Associated content: 

KORUS-AQ 04/21/16 Mission Daily Schedule

UPDATE FROM OSAN AB: (4/21/2016)

KORUS-AQ 04/20/16 Mission Daily Schedule

END OF THE DAY REPORT: Tuesday 4/19/2016

AFRC DC-8:
Work on instruments continues in preparation for the #2 instrument flight on Thursday.
Shipping coordination Continues.  If you have not spoken with Steven Todorov do so ASAP.

KORUS-AQ 04/19/16 Mission Daily Schedule

KORUS Plan for Tuesday 4/19 - AFRC DC-8
4/19: Tuesday
0700-1700  Aircraft and Lab Access
All flyers expecting to be on the Thursday Test Flight #2  contact Jack Dibb by 0900.  
Those who have not had egress training need to accounted for.

KORUS-AQ 04/18/16 Mission Daily Schedule

PLAN FOR 4/18:  Monday - 

KORUS-AQ 04/17/16 Mission Daily Schedule

PLAN FOR 4/17:  (escroll to the bottom for an update from Osan AB)
AFRC DC-8 KORUS Mission
4/17:  Sunday
0700-1200 Lab access only

DC-8 Loaded with KORUS Instruments

KORUS-AQ 04/16/16 Mission Daily Schedule

PLAN FOR 4/16
AFRC DC-8 KORUS Mission
4/16:  Saturday
0700-1700  Aircraft and Lab Access

4/17:  Sunday
0700-1200 Lab access only

KORUS-AQ 04/15/16 Mission Daily Schedule

PLAN FOR 4/15
Friday:  
0700-1200: DC-8 outside 
   Engine Run
   Pressurization check
   Wt / Balance - (Aircraft Inside Hangar) PI tool boxes in overhead to be included for Wt/Balance
1200-1400     Aircraft Pre-Flight
1400-1530     Engineering flight
1600-1700     Post-flight inspection
                        (Very Limited access)

DC-8 Palmdale laser calibrations

DC-8 In Palmdale

Pages

Subscribe to RSS - KORUS-AQ