KORUS-AQ 04/19/16 Mission Daily Schedule
KORUS Plan for Tuesday 4/19 - AFRC DC-8
4/19: Tuesday
0700-1700 Aircraft and Lab Access
All flyers expecting to be on the Thursday Test Flight #2 contact Jack Dibb by 0900.
Those who have not had egress training need to accounted for.
All teams must visit with Steven Todorov to discuss packing and shipments.
Shipping schedule:
Tuesday, 4/19
See Steven (650-996-9335) and identify which cases will go on which shipment
If shipping spares, identify the case dims and inventory
Wednesday, 4/20
Think Safety
Thursday, 4/21
All items to be shipped on 4/22 must be dropped off in the shipping area by 1600
Friday, 4/22
Shipment Departs 1000, ETA Osan AB 4/28
Pack
Saturday, 4/23
All items to be delivered to staging area by 1600
Sunday, 4/24
Personal Items due in the hangar by 0900
Monday, 4/25
Shipment Departs 1000, ETA Osan AB 5/2
Tuesday, 4/26
Transit
END OF THE DAY REPORT: Monday 4/18/2016
DC-8:
Instrument Test Flight #1 Complete
Most instruments were stating that there were mostly operational. Minor issues with many but claim to be fixable.
Jack Dibb requested all instruments start to download data.
4/20: Wednesday DC-8
AFRC Safety Stand Down Day – Aircraft Access may not be possible. TBD
There is some discussion of possible afternoon aircraft access if the training ends early at the main AFRC campus.
NOTES:
TOOL CONTROL = All Tools must be returned and signed off before each flight
INSPECTION = All Instruments must be secured and inspected before flight.
Weight/Balance = Any times removed or installed on the aircraft must be documented for weight and balance on the log sheet posted in the aircraft.
• Lab meeting 1300 every day except Saturday and Sunday.
LaRC B-200 Porgress- Is in transit to Osan Korea currently at Moffett Field, Ca.
The aircraft is up and being prepped to continue he journey to Korea.