AV-6 Fueling, AV-1 Pre-CST (08.05.13)

AV-1 Pre-CST Testing (08.05.13)

HS3 08/05/13 Daily Schedule

DFRC UPDATE: 

AV-6 Completed:

fueled

AV-1 Completed:

pre-CST

AV-1 Goals:

Pending: Nose camera lens update

Tuesday, August 6: CST; PI's optional, arrive 1100 in hangar. 1130 engine start

(delayed start due to airfield conflict)

Wednesday August 7: instrument pre-flight and aircraft pre-flight

Thursday August 8: range flight

ADELE re-installed AV-1 (08.02.13)

GH Equip Transport to WFF (08.02.13)

AV-6 S-HIS Range Post-Flight (08.02.13)

HS3 08/02/13 Daily Schedule

DFRC UPDATE:  

AV-1 Completed:

HIWRAP software update

ADELE re-installed

2 trucks loaded

AV-1 Goals:

Pending: Nose camera lens update

Monday August 5 - pre-CST; PI's arrive 0800 in hangar. Comsec training ~1300

AV-6 Completed:

Friday August 2 - instrument post-flight; SHIS/AVAPS crates to DFRC shipping

 

Seeing Which Way the Wind Blows

A new Doppler radar takes flight on this summer's HS3 mission.

AV-6 Tow for Range Flt (08.01.13)

AV-6 ready for Range Flt (08.01.13)