The website is undergoing a major upgrade that began Friday, October 11th at 5:00 PM PDT. The new upgraded site will be available no later than Monday, October 21st. Until that time, the current site will be visible but logins are disabled.
AV-1 rolling into D1 (08.14.13)
HS3 08/15/13 Daily Schedule
Dry Run continues daily through 08/16 (this Friday) at 0800 PDT/1100 EDT
On Saturday we commence regular Forecast briefings at 0830 and 2030 EDT
DFRC UPDATE (PDT):
AV-6 Goals:
Thursday Aug 15:
AV-6 Ferry
1700 Engine Start
1800 Take Off
Shipping - Coordinate with Dave Jordan on details
Friday August 16: truck shipment departs
HS3 08/14/13 Daily Schedule
Dry Run continues daily through 08/16 (this Friday) at 0800 PDT/1100 EDT
On Saturday we commence regular Forecast briefings at 0830 and 2030 EDT
DFRC UPDATE (PDT):
AV-6 Goals:
Pending: Nose camera lens installation and checkout
Thursday Aug 15:
AV-6 Ferry
1700 Engine Start
1800 Take Off
Shipping - Coordinate with Dave Jordan on details
HS3 08/13/13 Daily Schedule
Dry Run continues daily through 08/16 (this Friday) at 0800 PDT/1100 EDT
DFRC UPDATE (PDT):
AV-6 Goals:
Pending: Nose camera lens installation and checkout
AV-1 Goals:
Tuesday Aug 13: AV-1 Ferry
1700 Engine Start
1800 Take Off
Wednesday Aug 14:
AV6 Instrument Access for preflight (1000-1300)
Aircraft preflight
Bringing in AV-1 (8.14.13)
AV-1 in D1 Hangar (8.14.13)
AV-1 Arrives WFF (8.14.13)
AV-1 Science Team in the GHOCE POR (8.14.13)
AV-1 Touch Down at WFF (8.14.13)
Pages