Preflight AV-1 (08.12.13)
HS3 08/12/13 Daily Schedule
Dry Run continues daily until 08/16 at 0800 PDT/1100 EDT
DFRC UPDATE (PDT):
AV-6 Goals:
Pending: Nose camera lens installation and checkout
AV-1 Goals:
Monday Aug 12:
AV1 Instrument Access for preflight (1000-1300)
AV-1 Aircraft preflight
Tuesday Aug 13: AV-1 Ferry
1800 Engine Start
1900 Take Off
Wednesday Aug 14:
Busy Day on Thursday (08.08.13)
HS3 08/09/13 Daily Schedule
A quote from an instrument team member late for a deadline…."My biggest mistake was not reading the POD."
DFRC UPDATE:
AV-6 Goals:
Pending: Nose camera lens installation and checkout
AV-1 Completed:
Friday Aug 9: Instrument Postflight
AV-1 Goals:
Saturday Aug 10: No PI activities
Sunday Aug 11: Hard down Day
AV-1 after successful range flight (08.08.13)
HS3 08/08/13 Daily Schedule
DFRC UPDATE:
AV-6 Goals:
Pending: Nose camera lens installation and checkout
AV-1 Completed:
Instrument Range Flight
AV-1 Goals:
Pending: Nose camera lens installation and checkout
Friday Aug 9: Instrument Access for Postflight and, if desired, ferry
post/preflight (1000-1400)
Possible PI shipment to WFF. Contact Dave Jordan in hangar 4840, extension 2050.
AV-1 Preflight Insp. underway (08.07.13)
HS3 08/07/13 Daily Schedule
Forecast Dry Run; August 6-16; See email sent to list serve on 7/30/13, titled 'HS3 Dry Run 2013'.
Please Note: Transits next week are planned for takeoff at ~7 pm PDT; land ~0800 EDT. There is a possibility of a longer flight due to weather, science goals, or range conflicts. Please plan accordingly. See GHOC and GHOC-E Instrument Team Staffing notes below.
DFRC UPDATE:
AV-6 Goals:
Pending: Nose camera lens installation and checkout
HS3 08/06/13 Daily Schedule
DFRC UPDATE:
AV-6 Goals:
Pending: Nose camera lens update
AV-1 Completed:
CST
AV-1 Goals:
Pending: Nose camera lens update
Wednesday August 7; Instrument pre-flight and aircraft pre-flight
PI access 0800-1000 PDT
Thursday August 8; Range Flight
PIs not required
Engine start 0600
Take off 0700
2013 AV-1 Tow back after CST (8.6.13)