Warning message

Member access has been temporarily disabled. Please try again later.
The website is undergoing a major upgrade. Until that is complete, the current site will be visible but logins are disabled.
Synonyms: 
Operation Ice Bridge
Ice Bridge
IceBridge
Operations IceBridge
Associated content: 

Ready to unload some cargo. Temperature: a bone-freezing -50 F. (Kangerlussuaq, Greenland)

One more box for GRIT gets picked up at the 109th ANG. (Schenectady, NY)

With 4 P-3 engine heaters, there was almost no room to spare. Almost.(WFF)

Preparing for departure. DC-9, (WFF.)

OIB cargo being uploaded onto NASA DC-9. (WFF)

NASA DC-9, The Vomit Rocket, standing by to load our cargo (WFF).

P-3 ready to go and back in the hangar until deployment date, March 12, 2012. (WFF)

NASA OIB P-3 Orion having completed its final check flight before the start of OIB 2012 Arctic campaign.

OIB Science Instruments cargo ready for deployment. (WFF)

OIB Aircraft cargo ready for deployment. (WFF)

Pages

Subscribe to RSS - OIB