Associated content: 

Figure 1 for Plan of the Day, 4/23/2023

S-MODE 04/23/23 Mission Daily Schedule

Plan of the Day for Sunday, April 23:
 
Updates:

  • The B200 and MASS TO flew today.
  • The team would like to split some of the assets and investigate another eddy, labeled B in figure 1.

Aircraft plan and schedule:

  • All aircraft taking a hard down day
    • Outlook for Monday, April 24:
      • §  NET 1030: G-III SF#7 takeoff
      • §  1130: Preflight meeting for B200 SF#17
      • §  NET 1200: MASS TO SF#10 takeoff
      • §  NET 1300: B200 SF #17 takeoff

 Ship and in situ plan:

MASS SST and DopplerScatt Lines

RV Sally Ride Recovers a Lagrangian Float.

S-MODE 04/21/23 Mission Daily Schedule

Here is the S-MODE Plan of the Day for Friday, April 21:
 
Updates:

RV Sally Ride Team at Work

S-MODE 04/20/23 Mission Daily Schedule

Plan of the Day for Thursday, April 20:
 
Updates:

  • All three aircraft surveyed the current target area today.
  • The Sally Ride team redeployed five Lagrangian floats and did some CTD sampling across the eddy in multiple sections.

 Aircraft plan and schedule:

  • All aircraft will continue to collect data over the same target area.
  • NET 1000: G-III SF#5 takeoff
  • 1130: Preflight meeting for B200 SF#13
  • NET 1200: MASS TO SF#8 takeoff
  • NET 1300: B200 SF#13 takeoff

 Ship and in situ plan:

B-200 Preflight Meeting

Luke Colosi at the MASS Helm

S-MODE 04/19/23 Mission Daily Schedule

Updates:

Pages

Subscribe to RSS - S-MODE