Associated content: 
Sub-categories: 

HS3 08/26/12 Daily Schedule

HS3 Dryden POD

Monday, August 27, 2012

AV6 – Instrument PI access 0700-0900

AV6 – Preflight for Tuesday's Range Flight 0900-1500

Wallops POD - All times EDT

Monday, 8/27

DFRC: PreFlight for Range Flight planned for 8/28

WFF:No PI teams required

HS3 08/25/12 Daily Schedule

HS3 Dryden POD 2012-08-26

Saturday, August 25, 2012

AV6 CST was successful conditionally

Sunday, August 26, 2012

Hard Down Day - No access to Aircraft

PI Hangar access 0900-1200

Monday, August 27, 2012

AV6 – Instrument PI access 0700-0900

AV6 – Preflight for Tuesday's Range Flight 0900-1500

Wallops POD - All times EDT

Sunday, 8/26

WFF: No PI teams required - Hard Down Day

HS3 08/24/12 Daily Schedule

HS3 Dryden Plan of the Day 2012-08-25

Friday, August 24, 2012

AV6 Aircraft system testing was successful

Saturday, August 25, 2012

0500 T-0 preflight meeting
0600 AV6 CST

AV6 Instrument PIs should be in the GHOC by 0600

HS3 Wallops Plan of the Day 2012-08-25

WFF: All times EDT

Saturday, August 25, 2012

0800 Each instrument team should have at least one member in the PMOF for CST
0900 CST

PLEASE NOTE THE EARLIER CST START TIME

New HD Low-light Nose Cam (2012)

New HD Low-light Nose Cam (2012)

HS3 Logos on AV-1 (2012)

HS3 Logos on AV-1 (2012)

HIRAD Radome on GH mount (2012)

HIRAD Radome on GH mount (2012)

HIRAD arrives in GH Hangar (2012)

HIRAD arrives in GH Hangar (2012)

Gear-Swing during AV-6 Re-test (2012)

Gear-Swing during AV-6 Re-test (2012)

HS3 08/23/12 Daily Schedule

Thursday, August 23, 2012

AV6 Aircraft system testing continued

HS3 Dryden Plan of the Day 2012-08-24

0800-1200 AV6 Aircraft Operational Testing
1200-1500 Preflight for CST on Saturday

HS3 Wallops Plan of the Day 2012-08-24

WWF: All times EDT

1100-1500 Communication checks
No PI teams required

1330 Make up Safety Brief in conference room

Saturday, 8/25

1000 Each instrument team should have at least one member in PMOF for CST

HS3 08/22/12 Daily Schedule

Wednesday, 8/22 - Continued Troubleshooting

HS3 Dryden Plan of the Day 2012-08-23

AV6 Functional Checkout (All Day)
AV1 Continued science prep
No PI access on A/C

HS3 Wallops Plan of the Day 2012-08-23

No PI teams required

Pages

Subscribe to RSS - HS3