Download current revision of this file
XS19930514.ER2
- Mission: SPADE (10/13/1992-10/25/1993; Mission Website)
- Measurement Platform: ER-2 aircraft (Aircraft Webpage)
- Measurement Date: 19930514 (Fri, May 14, 1993)
- Current Revision: R0
- File Code: XS
- Measurement PI: Newman
- Description: GSFC met X-section along flt track
- File Format: Archive (plain-text) data file in Ames format
Revision History
Revision | Size | Uploaded |
---|---|---|
R0 | 113.45 KB | Sun, May 16, 1993 |