Operation IceBridge 2015 on HU-25C
2015-09-09 - 2015-10-23
»
|
||||||
«
HDSS & HIRAD - Hurricane Intercept Mission
2015-07-23 - 2015-10-30
»
|
||||||
«
P-3 Re-Wing, Empenage Work and PDM
2014-08-18 - 2016-06-05
»
|
||||||
«
Major Ops Inspection / AP, Nav Data, Comm System Upgrades
2015-03-27 - 2015-11-10
»
|
||||||
«
Scheduled Maintenance
2015-07-01 - 2016-01-28
»
|
||||||
«
600-Hour Maintenance
2015-09-14 - 2016-02-11
»
|
||||||
«
Airworthiness Assessment
2015-09-17 - 2015-09-28
|
NOAA SHOUT Download
2015-09-29 - 2015-09-30
|
Block 10 Standup
2015-10-01 - 2017-05-12
»
|
||||
«
NAMIS Audit
2015-09-21 - 2015-10-02
|
|
|||||
«
SLAPex Delmarva
2015-09-15 - 2015-09-30
|
Aircraft Repair
2015-10-01 - 2016-01-08
»
|
|||||
«
HyspIRI Fire Watch Flights (FR 152021)
2015-09-21 - 2015-10-09
»
|
||||||
«
Methane Sounder (FR 158010)/COSS (FR 158015)
2015-09-23 - 2015-10-08
»
|
||||||
«
AirMOSS Mission - Oregon, Canada
2015-09-21 - 2015-09-30
|
CARVE 2015
2015-10-01 - 2015-10-17
»
|
|||||
«
C-130 Modifications/ Annual Maintenance
2015-06-27 - 2016-04-19
»
|
||||||
«
Inmarsat Configuration Mod
2015-08-01 - 2015-11-15
»
|
||||||
«
NAAMES - Upload
2015-09-08 - 2015-10-22
»
|
||||||
|
SIERRA-2 Ground testing and Combined System Testing
2015-09-28 - 2015-10-30
»
|
|||||
SRPO Photo Chase - Download
2015-09-28 - 2015-09-30
|
Remote Sensing
2015-10-01 - 2016-01-29
»
|
|||||
|
|
AirMOSS Mission - Alaska
2015-09-30 - 2015-10-01
|
UAVSAR L-band Mission - Alaska
2015-10-02 - 2015-10-07
»
|
|||
Phase Inspection and Avionics Upgrade
2015-09-30 - 2015-12-31
»
|
||||||
|
|
|
||||
«
Operation IceBridge 2015 on HU-25C
2015-09-09 - 2015-10-23
»
|
||||||
«
UAVSAR L-band Mission - Alaska
2015-10-02 - 2015-10-07
|
UAVSAR L-band Mission - CA
2015-10-08 - 2015-10-16
»
|
|||||
«
HDSS & HIRAD - Hurricane Intercept Mission
2015-07-23 - 2015-10-30
»
|
||||||
«
P-3 Re-Wing, Empenage Work and PDM
2014-08-18 - 2016-06-05
»
|
||||||
«
Major Ops Inspection / AP, Nav Data, Comm System Upgrades
2015-03-27 - 2015-11-10
»
|
||||||
«
Scheduled Maintenance
2015-07-01 - 2016-01-28
»
|
||||||
«
600-Hour Maintenance
2015-09-14 - 2016-02-11
»
|
||||||
«
SIERRA-2 Ground testing and Combined System Testing
2015-09-28 - 2015-10-30
»
|
||||||
«
Phase Inspection and Avionics Upgrade
2015-09-30 - 2015-12-31
»
|
||||||
«
Block 10 Standup
2015-10-01 - 2017-05-12
»
|
||||||
«
Aircraft Repair
2015-10-01 - 2016-01-08
»
|
||||||
«
HyspIRI Fire Watch Flights (FR 152021)
2015-09-21 - 2015-10-09
|
HyspIRI (FR 152021)
2015-10-10 - 2015-10-26
»
|
|||||
«
Methane Sounder (FR 158010)/COSS (FR 158015)
2015-09-23 - 2015-10-08
|
|
|
||||
«
CARVE 2015
2015-10-01 - 2015-10-17
»
|
||||||
«
Remote Sensing
2015-10-01 - 2016-01-29
»
|
||||||
«
C-130 Modifications/ Annual Maintenance
2015-06-27 - 2016-04-19
»
|
||||||
«
Inmarsat Configuration Mod
2015-08-01 - 2015-11-15
»
|
||||||
«
NAAMES - Upload
2015-09-08 - 2015-10-22
»
|
||||||
|
Inmarsat Eval/GSP
2015-10-05 - 2015-10-30
»
|
|||||
|
|
|
Methane Sounder Download
2015-10-08 - 2015-10-09
|
|
||
|
|
|||||
«
Operation IceBridge 2015 on HU-25C
2015-09-09 - 2015-10-23
»
|
||||||
«
HDSS & HIRAD - Hurricane Intercept Mission
2015-07-23 - 2015-10-30
»
|
||||||
«
P-3 Re-Wing, Empenage Work and PDM
2014-08-18 - 2016-06-05
»
|
||||||
«
Major Ops Inspection / AP, Nav Data, Comm System Upgrades
2015-03-27 - 2015-11-10
»
|
||||||
«
Scheduled Maintenance
2015-07-01 - 2016-01-28
»
|
||||||
«
600-Hour Maintenance
2015-09-14 - 2016-02-11
»
|
||||||
«
SIERRA-2 Ground testing and Combined System Testing
2015-09-28 - 2015-10-30
»
|
||||||
«
Phase Inspection and Avionics Upgrade
2015-09-30 - 2015-12-31
»
|
||||||
«
Block 10 Standup
2015-10-01 - 2017-05-12
»
|
||||||
«
Aircraft Repair
2015-10-01 - 2016-01-08
»
|
||||||
«
HyspIRI (FR 152021)
2015-10-10 - 2015-10-26
»
|
||||||
«
CARVE 2015
2015-10-01 - 2015-10-17
|
||||||
«
Remote Sensing
2015-10-01 - 2016-01-29
»
|
||||||
«
UAVSAR L-band Mission - CA
2015-10-08 - 2015-10-16
|
|
|||||
«
C-130 Modifications/ Annual Maintenance
2015-06-27 - 2016-04-19
»
|
||||||
«
Inmarsat Configuration Mod
2015-08-01 - 2015-11-15
»
|
||||||
«
NAAMES - Upload
2015-09-08 - 2015-10-22
»
|
||||||
«
Inmarsat Eval/GSP
2015-10-05 - 2015-10-30
»
|
||||||
|
|
NAMIS Review
2015-10-13 - 2015-10-23
»
|
||||
|
|
|
|
|
||
«
Operation IceBridge 2015 on HU-25C
2015-09-09 - 2015-10-23
|
|
|||||
«
HDSS & HIRAD - Hurricane Intercept Mission
2015-07-23 - 2015-10-30
»
|
||||||
«
P-3 Re-Wing, Empenage Work and PDM
2014-08-18 - 2016-06-05
»
|
||||||
«
Major Ops Inspection / AP, Nav Data, Comm System Upgrades
2015-03-27 - 2015-11-10
»
|
||||||
«
Scheduled Maintenance
2015-07-01 - 2016-01-28
»
|
||||||
«
600-Hour Maintenance
2015-09-14 - 2016-02-11
»
|
||||||
«
SIERRA-2 Ground testing and Combined System Testing
2015-09-28 - 2015-10-30
»
|
||||||
«
Phase Inspection and Avionics Upgrade
2015-09-30 - 2015-12-31
»
|
||||||
«
Block 10 Standup
2015-10-01 - 2017-05-12
»
|
||||||
«
Aircraft Repair
2015-10-01 - 2016-01-08
»
|
||||||
«
NAMIS Review
2015-10-13 - 2015-10-23
|
|
|||||
«
HyspIRI (FR 152021)
2015-10-10 - 2015-10-26
»
|
||||||
«
Remote Sensing
2015-10-01 - 2016-01-29
»
|
||||||
«
C-130 Modifications/ Annual Maintenance
2015-06-27 - 2016-04-19
»
|
||||||
«
Inmarsat Configuration Mod
2015-08-01 - 2015-11-15
»
|
||||||
«
NAAMES - Upload
2015-09-08 - 2015-10-22
|
|
|
||||
«
Inmarsat Eval/GSP
2015-10-05 - 2015-10-30
»
|
||||||
|
992 Maintenance - Engine Change
2015-10-19 - 2015-10-30
»
|
|||||
|
|
|
|
|||
«
HDSS & HIRAD - Hurricane Intercept Mission
2015-07-23 - 2015-10-30
|
|
|||||
«
P-3 Re-Wing, Empenage Work and PDM
2014-08-18 - 2016-06-05
»
|
||||||
«
Major Ops Inspection / AP, Nav Data, Comm System Upgrades
2015-03-27 - 2015-11-10
»
|
||||||
«
Scheduled Maintenance
2015-07-01 - 2016-01-28
»
|
||||||
«
600-Hour Maintenance
2015-09-14 - 2016-02-11
»
|
||||||
«
SIERRA-2 Ground testing and Combined System Testing
2015-09-28 - 2015-10-30
|
|
|||||
«
Phase Inspection and Avionics Upgrade
2015-09-30 - 2015-12-31
»
|
||||||
«
Block 10 Standup
2015-10-01 - 2017-05-12
»
|
||||||
«
Aircraft Repair
2015-10-01 - 2016-01-08
»
|
||||||
«
992 Maintenance - Engine Change
2015-10-19 - 2015-10-30
|
|
|||||
«
HyspIRI (FR 152021)
2015-10-10 - 2015-10-26
|
Upload EXRAD, AirMSPI-2, AMPR
2015-10-27 - 2015-10-31
|
|||||
«
Remote Sensing
2015-10-01 - 2016-01-29
»
|
||||||
«
C-130 Modifications/ Annual Maintenance
2015-06-27 - 2016-04-19
»
|
||||||
«
Inmarsat Configuration Mod
2015-08-01 - 2015-11-15
»
|
||||||
«
Inmarsat Eval/GSP
2015-10-05 - 2015-10-30
|
|
|||||
|
GPM OLYMPEX Upload
2015-10-26 - 2015-11-09
»
|
|||||
AVIRIS/eMAS/AirMSPI-2 Flights
2015-10-28 - 2015-10-30
|
|
|||||
|
|