The website is undergoing a major upgrade that began Friday, October 11th at 5:00 PM PDT. The new upgraded site will be available no later than Monday, October 21st. Until that time, the current site will be visible but logins are disabled.
Sun | Mon | Tue | Wed | Thu | Fri | Sat |
---|---|---|---|---|---|---|
28 |
29 |
30 |
||||
«
Deployment
2014-07-09 - 2014-11-12
»
|
||||||
«
ARISE Mission
2014-09-01 - 2014-10-03
|
|
|||||
«
P-3 Re-Wing, Empenage Work and PDM
2014-08-18 - 2016-06-05
»
|
||||||
«
Annual Maintenance/Norway Mission Mods
2014-09-08 - 2014-10-22
»
|
||||||
«
Annual Maintenance
2014-09-24 - 2014-11-11
»
|
||||||
«
Head Worn Display
2014-09-02 - 2014-11-25
»
|
||||||
«
AirBOS2 Flights
2014-09-15 - 2014-10-03
|
|
|||||
«
HyspIRI
2014-09-15 - 2014-11-22
»
|
||||||
«
AVIRIS-NG
2014-09-19 - 2014-10-31
»
|
||||||
«
UAS in the NAS Flight Testing
2014-09-23 - 2014-10-23
»
|
||||||
«
HS3-Flight
2014-08-19 - 2014-09-29
|
HS3-Download
2014-09-30 - 2014-10-03
|
|
||||
«
Chlorophyll Flouresensce 2014
2014-09-10 - 2014-09-29
|
|
California Science Flights
2014-10-01 - 2014-12-12
»
|
||||
«
HDSS/OSC Analyzer/HIRAD/HIWRAP Payloads
2014-09-10 - 2014-11-21
»
|
||||||
«
AirMOSS Mission CA, Calibration (FRs 14G015/14G016)
2014-09-18 - 2014-09-28
|
Ejection Seat Inspection
2014-09-29 - 2014-10-03
|
|
||||
AirMOSS Mission OR/SK (FR 14G016)
2014-09-28 - 2014-10-08
»
|
||||||
«
ACAS-Xu Modification
2014-09-01 - 2014-10-21
»
|
||||||
«
OIB Antarctic Instrument Upload
2014-09-15 - 2014-10-03
|
|
|||||
|
PV Upload
2014-09-29 - 2014-10-03
|
|
||||
|
|
NAIMS
2014-10-01 - 2014-11-30
»
|
||||
NAIMS
2014-10-01 - 2014-11-30
»
|
||||||
|
CARVE-Deployment
2014-10-02 - 2014-10-16
»
|
|||||
|
|
|
||||
«
Deployment
2014-07-09 - 2014-11-12
»
|
||||||
«
P-3 Re-Wing, Empenage Work and PDM
2014-08-18 - 2016-06-05
»
|
||||||
«
Annual Maintenance/Norway Mission Mods
2014-09-08 - 2014-10-22
»
|
||||||
«
Annual Maintenance
2014-09-24 - 2014-11-11
»
|
||||||
«
Head Worn Display
2014-09-02 - 2014-11-25
»
|
||||||
«
HyspIRI
2014-09-15 - 2014-11-22
»
|
||||||
«
AVIRIS-NG
2014-09-19 - 2014-10-31
»
|
||||||
«
UAS in the NAS Flight Testing
2014-09-23 - 2014-10-23
»
|
||||||
«
California Science Flights
2014-10-01 - 2014-12-12
»
|
||||||
«
HDSS/OSC Analyzer/HIRAD/HIWRAP Payloads
2014-09-10 - 2014-11-21
»
|
||||||
«
AirMOSS Mission OR/SK (FR 14G016)
2014-09-28 - 2014-10-08
|
|
|
|
|||
«
NAIMS
2014-10-01 - 2014-11-30
»
|
||||||
«
NAIMS
2014-10-01 - 2014-11-30
»
|
||||||
«
CARVE-Deployment
2014-10-02 - 2014-10-16
»
|
||||||
«
ACAS-Xu Modification
2014-09-01 - 2014-10-21
»
|
||||||
|
PV Flights
2014-10-06 - 2014-10-14
»
|
|||||
OIB Local Flight
2014-10-06 - 2014-10-08
|
|
|
|
|||
CAST Instrument Platform Design & Fitting/Aircraft Maintenance
2014-10-06 - 2014-12-31
»
|
||||||
ARISE Mission Download
2014-10-06 - 2014-10-08
|
|
|
|
|||
AirBOS2 De-Integration
2014-10-06 - 2014-10-08
|
|
|
||||
|
AirMOSS AK Permafrost (FR 15G009)
2014-10-08 - 2014-10-10
|
|||||
|
|
|
||||
«
Deployment
2014-07-09 - 2014-11-12
»
|
||||||
OIB Antarctic Deployment
2014-10-12 - 2014-11-26
»
|
||||||
«
P-3 Re-Wing, Empenage Work and PDM
2014-08-18 - 2016-06-05
»
|
||||||
«
Annual Maintenance/Norway Mission Mods
2014-09-08 - 2014-10-22
»
|
||||||
«
Annual Maintenance
2014-09-24 - 2014-11-11
»
|
||||||
«
Head Worn Display
2014-09-02 - 2014-11-25
»
|
||||||
«
HyspIRI
2014-09-15 - 2014-11-22
»
|
||||||
«
AVIRIS-NG
2014-09-19 - 2014-10-31
»
|
||||||
«
UAS in the NAS Flight Testing
2014-09-23 - 2014-10-23
»
|
||||||
«
California Science Flights
2014-10-01 - 2014-12-12
»
|
||||||
«
PV Flights
2014-10-06 - 2014-10-14
|
DAWN Polar WInds Expedition
2014-10-15 - 2014-11-19
»
|
|||||
«
HDSS/OSC Analyzer/HIRAD/HIWRAP Payloads
2014-09-10 - 2014-11-21
»
|
||||||
«
NAIMS
2014-10-01 - 2014-11-30
»
|
||||||
«
NAIMS
2014-10-01 - 2014-11-30
»
|
||||||
«
CARVE-Deployment
2014-10-02 - 2014-10-16
|
NASA-AMES OPEN HOUSE SUPPORT
2014-10-17 - 2014-10-19
»
|
|||||
«
ACAS-Xu Modification
2014-09-01 - 2014-10-21
»
|
||||||
«
CAST Instrument Platform Design & Fitting/Aircraft Maintenance
2014-10-06 - 2014-12-31
»
|
||||||
|
|
Autopilot Phase II & III Ground and Flight Test [Place Holder]
2014-10-14 - 2014-10-24
»
|
||||
Annual Maintenance
2014-10-14 - 2015-01-19
»
|
||||||
AirMOSS Mission AZ/OK (FR 14G016)
2014-10-14 - 2014-10-23
»
|
||||||
AirSWOT Upload
2014-10-14 - 2014-10-17
|
Range Surveillence Flight
2014-10-18 - 2014-10-24
»
|
|||||
|
|
|
|
|||
«
Deployment
2014-07-09 - 2014-11-12
»
|
||||||
«
OIB Antarctic Deployment
2014-10-12 - 2014-11-26
»
|
||||||
«
DAWN Polar WInds Expedition
2014-10-15 - 2014-11-19
»
|
||||||
«
Autopilot Phase II & III Ground and Flight Test [Place Holder]
2014-10-14 - 2014-10-24
|
|
|||||
«
P-3 Re-Wing, Empenage Work and PDM
2014-08-18 - 2016-06-05
»
|
||||||
«
Annual Maintenance/Norway Mission Mods
2014-09-08 - 2014-10-22
|
Norway Photo Mission - Upload
2014-10-23 - 2014-10-24
|
|
||||
«
Annual Maintenance
2014-09-24 - 2014-11-11
»
|
||||||
«
Annual Maintenance
2014-10-14 - 2015-01-19
»
|
||||||
«
Head Worn Display
2014-09-02 - 2014-11-25
»
|
||||||
«
HyspIRI
2014-09-15 - 2014-11-22
»
|
||||||
«
AVIRIS-NG
2014-09-19 - 2014-10-31
»
|
||||||
«
UAS in the NAS Flight Testing
2014-09-23 - 2014-10-23
|
|
|
||||
«
California Science Flights
2014-10-01 - 2014-12-12
»
|
||||||
«
AirMOSS Mission AZ/OK (FR 14G016)
2014-10-14 - 2014-10-23
|
|
|
||||
«
Range Surveillence Flight
2014-10-18 - 2014-10-24
|
|
|||||
«
HDSS/OSC Analyzer/HIRAD/HIWRAP Payloads
2014-09-10 - 2014-11-21
»
|
||||||
«
NAIMS
2014-10-01 - 2014-11-30
»
|
||||||
«
NAIMS
2014-10-01 - 2014-11-30
»
|
||||||
«
NASA-AMES OPEN HOUSE SUPPORT
2014-10-17 - 2014-10-19
|
AirSWOT Engineering Validation Flights
2014-10-20 - 2014-11-19
»
|
|||||
«
ACAS-Xu Modification
2014-09-01 - 2014-10-21
|
ACAS-Xu Flight Test
2014-10-22 - 2015-01-15
»
|
|||||
«
CAST Instrument Platform Design & Fitting/Aircraft Maintenance
2014-10-06 - 2014-12-31
»
|
||||||
|
|
|
|
|
|
|
1 |
||||||
«
Deployment
2014-07-09 - 2014-11-12
»
|
||||||
«
OIB Antarctic Deployment
2014-10-12 - 2014-11-26
»
|
||||||
«
DAWN Polar WInds Expedition
2014-10-15 - 2014-11-19
»
|
||||||
«
ACAS-Xu Flight Test
2014-10-22 - 2015-01-15
»
|
||||||
«
P-3 Re-Wing, Empenage Work and PDM
2014-08-18 - 2016-06-05
»
|
||||||
«
Annual Maintenance
2014-09-24 - 2014-11-11
»
|
||||||
«
Annual Maintenance
2014-10-14 - 2015-01-19
»
|
||||||
«
Head Worn Display
2014-09-02 - 2014-11-25
»
|
||||||
«
HyspIRI
2014-09-15 - 2014-11-22
»
|
||||||
«
AVIRIS-NG
2014-09-19 - 2014-10-31
|
|
|||||
«
California Science Flights
2014-10-01 - 2014-12-12
»
|
||||||
«
AirSWOT Engineering Validation Flights
2014-10-20 - 2014-11-19
»
|
||||||
«
HDSS/OSC Analyzer/HIRAD/HIWRAP Payloads
2014-09-10 - 2014-11-21
»
|
||||||
«
NAIMS
2014-10-01 - 2014-11-30
»
|
||||||
«
NAIMS
2014-10-01 - 2014-11-30
»
|
||||||
«
CAST Instrument Platform Design & Fitting/Aircraft Maintenance
2014-10-06 - 2014-12-31
»
|
||||||
|
New Orleans/Arizona Deployment
2014-10-27 - 2014-10-29
|
|
|
|
||
Norway Photo Mission - Upload
2014-10-27 - 2014-10-31
|
|
|||||
HSRL Upload
2014-10-27 - 2014-11-11
»
|
||||||
|
Deconfigure from AirMOSS
2014-10-28 - 2014-10-31
|
|
||||
|
|
|