Minor Ops Inspection
2013-11-20 - 2014-02-28
|
UAS Modifications/Ground Tests
2014-03-01 - 2014-04-30
»
|
|||||
«
AirMOSS Mission CA, Calibration (FRs 14G015/14G016)
2014-02-10 - 2014-02-24
|
|
|
Deconfigure from AirMOSS
2014-02-27 - 2014-03-03
»
|
|||
«
Acceptance Inspection
2013-09-11 - 2014-04-03
»
|
||||||
«
DC-8 at Heavy C Check Facility
2013-11-12 - 2014-03-01
|
||||||
«
Major Ops Inspection
2013-12-16 - 2014-08-18
»
|
||||||
«
600-Hr Inspection/Maintenance
2014-01-06 - 2014-04-08
»
|
||||||
«
Phase 3 and 4 Inspection
2014-02-03 - 2014-02-28
|
|
|||||
«
Remote Sensing Avionics Upgrade
2014-02-03 - 2014-03-31
»
|
||||||
«
Scheduled Maintenance
2014-02-14 - 2014-03-28
»
|
||||||
«
UAS in the NAS Hardware Integration
2014-02-17 - 2014-02-28
|
|
|||||
«
ACES
2014-02-03 - 2014-03-14
»
|
||||||
«
AirSWOT Cal/Check Flights
2014-02-13 - 2014-05-16
»
|
||||||
«
ATTREX Deployment Guam
2014-01-21 - 2014-03-14
»
|
||||||
«
NGC Work
2013-12-06 - 2014-06-30
»
|
||||||
|
Operation Ice Bridge - Upload
2014-02-24 - 2014-02-26
|
|
||||
|
|
|||||
«
Deconfigure from AirMOSS
2014-02-27 - 2014-03-03
|
|
|
|
Direct Return Mission
2014-03-07 - 2014-03-11
»
|
||
«
Acceptance Inspection
2013-09-11 - 2014-04-03
»
|
||||||
«
Major Ops Inspection
2013-12-16 - 2014-08-18
»
|
||||||
«
600-Hr Inspection/Maintenance
2014-01-06 - 2014-04-08
»
|
||||||
«
Remote Sensing Avionics Upgrade
2014-02-03 - 2014-03-31
»
|
||||||
«
Scheduled Maintenance
2014-02-14 - 2014-03-28
»
|
||||||
«
ACES
2014-02-03 - 2014-03-14
»
|
||||||
«
AirSWOT Cal/Check Flights
2014-02-13 - 2014-05-16
»
|
||||||
«
ATTREX Deployment Guam
2014-01-21 - 2014-03-14
»
|
||||||
«
NGC Work
2013-12-06 - 2014-06-30
»
|
||||||
«
UAS Modifications/Ground Tests
2014-03-01 - 2014-04-30
»
|
||||||
|
DC-8 at Palmdale SAIF in post Heavy C Check reassembled
2014-03-03 - 2014-04-18
»
|
|||||
WFF Closed Due to Snow
2014-03-03 - 2014-03-04
|
|
|
|
|
||
UAS in the NAS Hardware Integration
2014-03-03 - 2014-03-07
|
|
|||||
Local Flights
2014-03-03 - 2014-03-05
|
|
|
|
|||
CALIPSO Cal/Val
2014-03-03 - 2014-04-15
»
|
||||||
|
|
|
||||
«
Direct Return Mission
2014-03-07 - 2014-03-11
|
|
|
|
GH 872 Team Returns to DFRC
2014-03-15 - 2014-03-17
»
|
||
«
Acceptance Inspection
2013-09-11 - 2014-04-03
»
|
||||||
«
Major Ops Inspection
2013-12-16 - 2014-08-18
»
|
||||||
«
600-Hr Inspection/Maintenance
2014-01-06 - 2014-04-08
»
|
||||||
«
Remote Sensing Avionics Upgrade
2014-02-03 - 2014-03-31
»
|
||||||
«
Scheduled Maintenance
2014-02-14 - 2014-03-28
»
|
||||||
«
DC-8 at Palmdale SAIF in post Heavy C Check reassembled
2014-03-03 - 2014-04-18
»
|
||||||
«
ACES
2014-02-03 - 2014-03-14
|
|
|||||
«
AirSWOT Cal/Check Flights
2014-02-13 - 2014-05-16
»
|
||||||
«
ATTREX Deployment Guam
2014-01-21 - 2014-03-14
|
|
|||||
«
CALIPSO Cal/Val
2014-03-03 - 2014-04-15
»
|
||||||
«
NGC Work
2013-12-06 - 2014-06-30
»
|
||||||
«
UAS Modifications/Ground Tests
2014-03-01 - 2014-04-30
»
|
||||||
|
Maintenance
2014-03-10 - 2014-04-16
»
|
|||||
Operation Ice Bridge
2014-03-10 - 2014-05-23
»
|
||||||
|
|
Reconfigure for AirMOSS
2014-03-12 - 2014-03-16
»
|
||||
|
|
|
|
|||
«
GH 872 Team Returns to DFRC
2014-03-15 - 2014-03-17
|
AirMOSS Mission Calibration (FR 14G015)
2014-03-18 - 2014-03-23
»
|
|||||
«
Acceptance Inspection
2013-09-11 - 2014-04-03
»
|
||||||
«
Major Ops Inspection
2013-12-16 - 2014-08-18
»
|
||||||
«
600-Hr Inspection/Maintenance
2014-01-06 - 2014-04-08
»
|
||||||
«
Remote Sensing Avionics Upgrade
2014-02-03 - 2014-03-31
»
|
||||||
«
Scheduled Maintenance
2014-02-14 - 2014-03-28
»
|
||||||
«
DC-8 at Palmdale SAIF in post Heavy C Check reassembled
2014-03-03 - 2014-04-18
»
|
||||||
«
Maintenance
2014-03-10 - 2014-04-16
»
|
||||||
«
AirSWOT Cal/Check Flights
2014-02-13 - 2014-05-16
»
|
||||||
«
CALIPSO Cal/Val
2014-03-03 - 2014-04-15
»
|
||||||
«
Operation Ice Bridge
2014-03-10 - 2014-05-23
»
|
||||||
«
NGC Work
2013-12-06 - 2014-06-30
»
|
||||||
«
UAS Modifications/Ground Tests
2014-03-01 - 2014-04-30
»
|
||||||
«
Reconfigure for AirMOSS
2014-03-12 - 2014-03-16
|
B Check
2014-03-17 - 2014-04-11
»
|
|||||
|
|
ATTREX Download
2014-03-18 - 2014-04-18
»
|
||||
|
UAS in the NAS Flight Testing
2014-03-20 - 2014-04-18
»
|
|||||
|
Airshow Flyover
2014-03-21 - 2014-03-22
|
|||||
|
|
|||||
«
Acceptance Inspection
2013-09-11 - 2014-04-03
»
|
||||||
«
Major Ops Inspection
2013-12-16 - 2014-08-18
»
|
||||||
«
600-Hr Inspection/Maintenance
2014-01-06 - 2014-04-08
»
|
||||||
«
Remote Sensing Avionics Upgrade
2014-02-03 - 2014-03-31
»
|
||||||
«
Scheduled Maintenance
2014-02-14 - 2014-03-28
|
|
|||||
«
DC-8 at Palmdale SAIF in post Heavy C Check reassembled
2014-03-03 - 2014-04-18
»
|
||||||
«
Maintenance
2014-03-10 - 2014-04-16
»
|
||||||
«
B Check
2014-03-17 - 2014-04-11
»
|
||||||
Ship 2 Modifications
2014-03-23 - 2014-07-31
»
|
||||||
«
AirSWOT Cal/Check Flights
2014-02-13 - 2014-05-16
»
|
||||||
«
UAS in the NAS Flight Testing
2014-03-20 - 2014-04-18
»
|
||||||
«
CALIPSO Cal/Val
2014-03-03 - 2014-04-15
»
|
||||||
«
Operation Ice Bridge
2014-03-10 - 2014-05-23
»
|
||||||
«
AirMOSS Mission Calibration (FR 14G015)
2014-03-18 - 2014-03-23
|
AirMOSS Mission CR (FR 14G016)
2014-03-24 - 2014-04-02
»
|
|||||
«
NGC Work
2013-12-06 - 2014-06-30
»
|
||||||
«
UAS Modifications/Ground Tests
2014-03-01 - 2014-04-30
»
|
||||||
«
ATTREX Download
2014-03-18 - 2014-04-18
»
|
||||||
|
Two-Micron IPDA Lidar Flight Test
2014-03-24 - 2014-04-18
»
|
|||||
NAIMS
2014-03-24 - 2014-03-28
|
|
|||||
|
H-2 Payload I&T
2014-03-26 - 2014-04-13
»
|
|||||
|
|
|
|
|||
1 |
2 |
3 |
4 |
5 |
||
«
AirMOSS Mission CR (FR 14G016)
2014-03-24 - 2014-04-02
|
992 Maintenance
2014-04-03 - 2014-04-11
»
|
|||||
«
Acceptance Inspection
2013-09-11 - 2014-04-03
|
|
|
||||
«
Major Ops Inspection
2013-12-16 - 2014-08-18
»
|
||||||
«
600-Hr Inspection/Maintenance
2014-01-06 - 2014-04-08
»
|
||||||
«
Remote Sensing Avionics Upgrade
2014-02-03 - 2014-03-31
|
Flight Testing
2014-04-01 - 2014-05-15
»
|
|||||
«
DC-8 at Palmdale SAIF in post Heavy C Check reassembled
2014-03-03 - 2014-04-18
»
|
||||||
«
Maintenance
2014-03-10 - 2014-04-16
»
|
||||||
«
B Check
2014-03-17 - 2014-04-11
»
|
||||||
«
Ship 2 Modifications
2014-03-23 - 2014-07-31
»
|
||||||
«
AirSWOT Cal/Check Flights
2014-02-13 - 2014-05-16
»
|
||||||
«
UAS in the NAS Flight Testing
2014-03-20 - 2014-04-18
»
|
||||||
«
Two-Micron IPDA Lidar Flight Test
2014-03-24 - 2014-04-18
»
|
||||||
«
CALIPSO Cal/Val
2014-03-03 - 2014-04-15
»
|
||||||
«
Operation Ice Bridge
2014-03-10 - 2014-05-23
»
|
||||||
«
H-2 Payload I&T
2014-03-26 - 2014-04-13
»
|
||||||
«
NGC Work
2013-12-06 - 2014-06-30
»
|
||||||
«
UAS Modifications/Ground Tests
2014-03-01 - 2014-04-30
»
|
||||||
«
ATTREX Download
2014-03-18 - 2014-04-18
»
|
||||||
|
HyspIRI
2014-03-31 - 2014-05-09
»
|
|||||
|
|