The website is undergoing a major upgrade. Until that is complete, the current site will be visible but logins are disabled.
Sun | Mon | Tue | Wed | Thu | Fri | Sat |
---|---|---|---|---|---|---|
«
Direct Return Mission
2012-06-27 - 2012-07-02
|
|
|
Post Mission Maintenance
2012-07-05 - 2012-07-06
|
|
||
New Orleans Oil Spill Impact
2012-07-01 - 2012-07-02
|
|
|
DC-8 CPDLC Avionics Install
2012-07-05 - 2012-08-03
»
|
|||
«
ASMLS I&T
2012-06-25 - 2012-07-06
|
|
|||||
«
Major aircraft modification: MQ-9 "Block 1" Upgrade and Acceptance Test
2012-02-01 - 2013-03-15
»
|
||||||
«
Phase
2012-05-01 - 2012-08-15
»
|
||||||
«
Maintenance
2012-05-07 - 2012-08-03
»
|
||||||
«
Deployment
2012-03-03 - 2012-12-06
»
|
||||||
ATTREX Upload of HS3
2012-07-01 - 2012-08-31
»
|
||||||
HS3 Aircraft Mods / Instr. Upload
2012-07-01 - 2012-08-27
»
|
||||||
|
Two Column Aerosol Project
2012-07-02 - 2012-07-31
»
|
|||||
SARP 2012 - Download
2012-07-02 - 2012-07-03
|
|
|
|
|
||
North Dakota Deployment - SMAPVEX12
2012-07-03 - 2012-07-17
»
|
||||||
Reconfigure for AirMOSS
2012-07-03 - 2012-07-07
|
||||||
|
|
|
|
|||
«
Major aircraft modification: MQ-9 "Block 1" Upgrade and Acceptance Test
2012-02-01 - 2013-03-15
»
|
||||||
«
Phase
2012-05-01 - 2012-08-15
»
|
||||||
«
Maintenance
2012-05-07 - 2012-08-03
»
|
||||||
«
Deployment
2012-03-03 - 2012-12-06
»
|
||||||
«
Two Column Aerosol Project
2012-07-02 - 2012-07-31
»
|
||||||
«
North Dakota Deployment - SMAPVEX12
2012-07-03 - 2012-07-17
»
|
||||||
«
ATTREX Upload of HS3
2012-07-01 - 2012-08-31
»
|
||||||
«
HS3 Aircraft Mods / Instr. Upload
2012-07-01 - 2012-08-27
»
|
||||||
«
DC-8 CPDLC Avionics Install
2012-07-05 - 2012-08-03
»
|
||||||
HR-2 PAYLOAD & COMM SYS CHECKOUT
2012-07-09 - 2012-08-24
»
|
||||||
PRISM
2012-07-09 - 2012-07-27
»
|
||||||
AirMOSS Deployment Palmdale, CA (FRs 12G029/12G031)
2012-07-09 - 2012-08-10
»
|
||||||
LIDAR Upload
2012-07-09 - 2012-07-13
|
|
|||||
NAIMS integration
2012-07-09 - 2012-08-17
»
|
||||||
100-hr inspection
2012-07-10 - 2012-07-20
»
|
||||||
Superpod Install
2012-07-10 - 2012-07-11
|
600 hr Phase Inspection
2012-07-12 - 2012-12-14
»
|
|||||
|
|
|
|
|
||
«
North Dakota Deployment - SMAPVEX12
2012-07-03 - 2012-07-17
|
DC3/SEAC4RS Instrument Download
2012-07-18 - 2012-07-27
»
|
|||||
«
HR-2 PAYLOAD & COMM SYS CHECKOUT
2012-07-09 - 2012-08-24
»
|
||||||
«
Major aircraft modification: MQ-9 "Block 1" Upgrade and Acceptance Test
2012-02-01 - 2013-03-15
»
|
||||||
«
Phase
2012-05-01 - 2012-08-15
»
|
||||||
«
Maintenance
2012-05-07 - 2012-08-03
»
|
||||||
«
General Aircraft Maintenance (Eng#1, Lightning Strike Trim Tab Damage Repair, Right Wing Fuel Leak Repair)
2012-07-09 - 2012-08-10
»
|
||||||
«
100-hr inspection
2012-07-10 - 2012-07-20
|
|
|||||
«
600 hr Phase Inspection
2012-07-12 - 2012-12-14
»
|
||||||
«
Deployment
2012-03-03 - 2012-12-06
»
|
||||||
«
Two Column Aerosol Project
2012-07-02 - 2012-07-31
»
|
||||||
«
PRISM
2012-07-09 - 2012-07-27
»
|
||||||
«
AirMOSS Deployment Palmdale, CA (FRs 12G029/12G031)
2012-07-09 - 2012-08-10
»
|
||||||
«
ATTREX Upload of HS3
2012-07-01 - 2012-08-31
»
|
||||||
«
HS3 Aircraft Mods / Instr. Upload
2012-07-01 - 2012-08-27
»
|
||||||
«
DC-8 CPDLC Avionics Install
2012-07-05 - 2012-08-03
»
|
||||||
«
NAIMS integration
2012-07-09 - 2012-08-17
»
|
||||||
|
Joint EPA Sensors
2012-07-16 - 2012-07-20
|
|
||||
CARVE - Deployment
2012-07-16 - 2012-07-30
»
|
||||||
|
||||||
«
HR-2 PAYLOAD & COMM SYS CHECKOUT
2012-07-09 - 2012-08-24
»
|
||||||
«
Major aircraft modification: MQ-9 "Block 1" Upgrade and Acceptance Test
2012-02-01 - 2013-03-15
»
|
||||||
«
Phase
2012-05-01 - 2012-08-15
»
|
||||||
«
Maintenance
2012-05-07 - 2012-08-03
»
|
||||||
«
General Aircraft Maintenance (Eng#1, Lightning Strike Trim Tab Damage Repair, Right Wing Fuel Leak Repair)
2012-07-09 - 2012-08-10
»
|
||||||
«
600 hr Phase Inspection
2012-07-12 - 2012-12-14
»
|
||||||
«
Deployment
2012-03-03 - 2012-12-06
»
|
||||||
«
Two Column Aerosol Project
2012-07-02 - 2012-07-31
»
|
||||||
«
PRISM
2012-07-09 - 2012-07-27
|
|
|||||
«
AirMOSS Deployment Palmdale, CA (FRs 12G029/12G031)
2012-07-09 - 2012-08-10
»
|
||||||
«
CARVE - Deployment
2012-07-16 - 2012-07-30
»
|
||||||
«
ATTREX Upload of HS3
2012-07-01 - 2012-08-31
»
|
||||||
«
HS3 Aircraft Mods / Instr. Upload
2012-07-01 - 2012-08-27
»
|
||||||
«
DC-8 CPDLC Avionics Install
2012-07-05 - 2012-08-03
»
|
||||||
«
NAIMS integration
2012-07-09 - 2012-08-17
»
|
||||||
«
DC3/SEAC4RS Instrument Download
2012-07-18 - 2012-07-27
|
|
|||||
|
Install CCMP Engine
2012-07-23 - 2012-08-03
»
|
|||||
LIDAR
2012-07-23 - 2012-07-24
|
|
|
|
|
||
Payload testing (Earthquake Hazards and Seagrass) at Crows Landing
2012-07-23 - 2012-07-27
|
|
|||||
Post Mission Maintenance
2012-07-26 - 2012-08-03
»
|
||||||
|
|
|||||
1 |
2 |
3 |
4 |
|||
«
HR-2 PAYLOAD & COMM SYS CHECKOUT
2012-07-09 - 2012-08-24
»
|
||||||
«
Major aircraft modification: MQ-9 "Block 1" Upgrade and Acceptance Test
2012-02-01 - 2013-03-15
»
|
||||||
«
Phase
2012-05-01 - 2012-08-15
»
|
||||||
«
Maintenance
2012-05-07 - 2012-08-03
|
|
|||||
«
General Aircraft Maintenance (Eng#1, Lightning Strike Trim Tab Damage Repair, Right Wing Fuel Leak Repair)
2012-07-09 - 2012-08-10
»
|
||||||
«
600 hr Phase Inspection
2012-07-12 - 2012-12-14
»
|
||||||
«
Install CCMP Engine
2012-07-23 - 2012-08-03
|
|
|||||
«
Post Mission Maintenance
2012-07-26 - 2012-08-03
|
|
|||||
«
Deployment
2012-03-03 - 2012-12-06
»
|
||||||
«
Two Column Aerosol Project
2012-07-02 - 2012-07-31
|
HS3 Upload
2012-08-01 - 2012-10-31
»
|
|||||
«
AirMOSS Deployment Palmdale, CA (FRs 12G029/12G031)
2012-07-09 - 2012-08-10
»
|
||||||
«
CARVE - Deployment
2012-07-16 - 2012-07-30
|
|
|
|
|
|
|
«
ATTREX Upload of HS3
2012-07-01 - 2012-08-31
»
|
||||||
«
HS3 Aircraft Mods / Instr. Upload
2012-07-01 - 2012-08-27
»
|
||||||
«
DC-8 CPDLC Avionics Install
2012-07-05 - 2012-08-03
|
|
|||||
«
NAIMS integration
2012-07-09 - 2012-08-17
»
|
||||||
|
|
|
|
|