The website is undergoing a major upgrade. Until that is complete, the current site will be visible but logins are disabled.
Sun | Mon | Tue | Wed | Thu | Fri | Sat |
---|---|---|---|---|---|---|
«
Aircraft Engineering Modifications
2011-09-19 - 2012-03-23
»
|
||||||
«
Aircraft Configuration
2011-11-16 - 2012-01-19
»
|
||||||
«
Integration for Fault detection in Surprise Valley, CA - Jonathan Glen
2011-11-21 - 2012-01-20
»
|
||||||
«
KQX Envelope Expansion
2011-10-01 - 2012-06-30
»
|
||||||
«
KQX Envelope Expansion
2011-11-14 - 2012-06-30
»
|
||||||
«
809 Phase Inspection
2011-07-01 - 2012-05-25
»
|
||||||
«
N928 Minor Ops Inspection
2011-09-11 - 2012-03-23
»
|
||||||
«
Annual Maintenance and Upgrades
2011-09-26 - 2012-01-06
|
Hawaii Deployment - Volcano Science
2012-01-07 - 2012-01-14
»
|
|||||
«
Routine Maintenance
2011-11-28 - 2012-01-08
»
|
||||||
«
Maintenance
2011-12-12 - 2012-01-03
|
Piot Profs
2012-01-04 - 2012-01-05
|
|
|
|||
«
Annual Maintenance
2011-12-23 - 2012-02-24
»
|
||||||
«
N926 DEPLOYMENT
2011-11-15 - 2012-02-01
»
|
||||||
«
GCPEX Instrument Integration
2011-12-13 - 2012-01-08
»
|
||||||
Integration of ADS-B in support of the UAS in the NAS Project
2012-01-01 - 2012-03-02
»
|
||||||
|
|
GCPEX Instruments Upload
2012-01-03 - 2012-01-13
»
|
||||
|
AirMSPI Upload
2012-01-04 - 2012-01-05
|
|
||||
|
|
|||||
«
Aircraft Engineering Modifications
2011-09-19 - 2012-03-23
»
|
||||||
«
Aircraft Configuration
2011-11-16 - 2012-01-19
»
|
||||||
«
Integration for Fault detection in Surprise Valley, CA - Jonathan Glen
2011-11-21 - 2012-01-20
»
|
||||||
«
KQX Envelope Expansion
2011-10-01 - 2012-06-30
»
|
||||||
«
KQX Envelope Expansion
2011-11-14 - 2012-06-30
»
|
||||||
«
809 Phase Inspection
2011-07-01 - 2012-05-25
»
|
||||||
«
N928 Minor Ops Inspection
2011-09-11 - 2012-03-23
»
|
||||||
«
Routine Maintenance
2011-11-28 - 2012-01-08
|
|
|
|
|
Maintenance
2012-01-13 - 2012-02-03
»
|
|
«
Annual Maintenance
2011-12-23 - 2012-02-24
»
|
||||||
«
N926 DEPLOYMENT
2011-11-15 - 2012-02-01
»
|
||||||
«
Hawaii Deployment - Volcano Science
2012-01-07 - 2012-01-14
|
||||||
«
GCPEX Instrument Integration
2011-12-13 - 2012-01-08
|
|
|
|
|
AirSWOT Check Flights
2012-01-13 - 2012-01-30
»
|
|
«
Integration of ADS-B in support of the UAS in the NAS Project
2012-01-01 - 2012-03-02
»
|
||||||
«
GCPEX Instruments Upload
2012-01-03 - 2012-01-13
|
||||||
|
|
|||||
«
Aircraft Engineering Modifications
2011-09-19 - 2012-03-23
»
|
||||||
«
Aircraft Configuration
2011-11-16 - 2012-01-19
|
No Fly Maint
2012-01-20 - 2012-01-27
»
|
|||||
«
Integration for Fault detection in Surprise Valley, CA - Jonathan Glen
2011-11-21 - 2012-01-20
|
|
|||||
«
KQX Envelope Expansion
2011-10-01 - 2012-06-30
»
|
||||||
«
KQX Envelope Expansion
2011-11-14 - 2012-06-30
»
|
||||||
«
809 Phase Inspection
2011-07-01 - 2012-05-25
»
|
||||||
«
N928 Minor Ops Inspection
2011-09-11 - 2012-03-23
»
|
||||||
«
Annual Maintenance
2011-12-23 - 2012-02-24
»
|
||||||
«
Maintenance
2012-01-13 - 2012-02-03
»
|
||||||
«
AirSWOT Check Flights
2012-01-13 - 2012-01-30
»
|
||||||
«
N926 DEPLOYMENT
2011-11-15 - 2012-02-01
»
|
||||||
«
Integration of ADS-B in support of the UAS in the NAS Project
2012-01-01 - 2012-03-02
»
|
||||||
|
|
GCPEX Deployment - Bangor, Maine
2012-01-17 - 2012-02-25
»
|
||||
|
||||||
«
Aircraft Engineering Modifications
2011-09-19 - 2012-03-23
»
|
||||||
«
KQX Envelope Expansion
2011-10-01 - 2012-06-30
»
|
||||||
«
KQX Envelope Expansion
2011-11-14 - 2012-06-30
»
|
||||||
«
809 Phase Inspection
2011-07-01 - 2012-05-25
»
|
||||||
«
N928 Minor Ops Inspection
2011-09-11 - 2012-03-23
»
|
||||||
«
Annual Maintenance
2011-12-23 - 2012-02-24
»
|
||||||
«
Maintenance
2012-01-13 - 2012-02-03
»
|
||||||
«
No Fly Maint
2012-01-20 - 2012-01-27
|
Aircraft Configuration
2012-01-28 - 2012-01-29
»
|
|||||
«
AirSWOT Check Flights
2012-01-13 - 2012-01-30
»
|
||||||
«
N926 DEPLOYMENT
2011-11-15 - 2012-02-01
»
|
||||||
«
GCPEX Deployment - Bangor, Maine
2012-01-17 - 2012-02-25
»
|
||||||
«
Integration of ADS-B in support of the UAS in the NAS Project
2012-01-01 - 2012-03-02
»
|
||||||
|
AFRSB/FRR for Fault detection in Surprise Valley, CA - Jonathan Glen
2012-01-23 - 2012-01-29
»
|
|||||
|
Aircraft Configuration
2012-01-27 - 2012-01-29
»
|
|||||
|
||||||
1 |
2 |
3 |
4 |
|||
«
Aircraft Engineering Modifications
2011-09-19 - 2012-03-23
»
|
||||||
«
Aircraft Configuration
2012-01-27 - 2012-01-29
|
Operation Ice Bridge
2012-01-30 - 2012-02-26
»
|
|||||
«
Aircraft Configuration
2012-01-28 - 2012-01-29
|
|
Repair a fuel line leak
2012-01-31 - 2012-04-01
»
|
||||
«
AFRSB/FRR for Fault detection in Surprise Valley, CA - Jonathan Glen
2012-01-23 - 2012-01-29
|
|
|
Annual Inspection
2012-02-01 - 2012-03-30
»
|
|||
«
KQX Envelope Expansion
2011-10-01 - 2012-06-30
»
|
||||||
«
KQX Envelope Expansion
2011-11-14 - 2012-06-30
»
|
||||||
«
809 Phase Inspection
2011-07-01 - 2012-05-25
»
|
||||||
«
N928 Minor Ops Inspection
2011-09-11 - 2012-03-23
»
|
||||||
«
Annual Maintenance
2011-12-23 - 2012-02-24
»
|
||||||
«
Maintenance
2012-01-13 - 2012-02-03
|
|
|||||
«
AirSWOT Check Flights
2012-01-13 - 2012-01-30
|
|
Maintenance and Aircraft Modfications
2012-02-01 - 2012-04-15
»
|
||||
«
N926 DEPLOYMENT
2011-11-15 - 2012-02-01
|
Minor MX Inspection
2012-02-02 - 2012-03-02
»
|
|||||
«
GCPEX Deployment - Bangor, Maine
2012-01-17 - 2012-02-25
»
|
||||||
«
Integration of ADS-B in support of the UAS in the NAS Project
2012-01-01 - 2012-03-02
»
|
||||||
|
Major aircraft modification: MQ-9 "Block 1" Upgrade and Acceptance Test
2012-02-01 - 2013-03-15
»
|
|||||
|
MR-TCDL download
2012-02-02 - 2012-02-03
|
|
||||
|