The website is undergoing a major upgrade that began Friday, October 11th at 5:00 PM PDT. The new upgraded site will be available no later than Monday, October 21st. Until that time, the current site will be visible but logins are disabled.
AWAS Team at AFRC
Kate Smith (AWAS) works with a few ER-2 crew during an instrument check. All worked together to move the checks to a favorable conclusion for the day.