KORUS-AQ 04/13/16 Mission Daily Schedule

PLAN FOR 4/13
0700 - 1700: Instrument Integration CAFS, CIT-CIMS, DIAL, GT-CIMS, K-ACES, K-CIMS, K-PTR-MS and LARGE.
NOTE:
Wednesday
0600 the plane will go outside for DIAL calibrations. 
0700 – 1700 Instrument access.
Thursday
May also involve outdoor calibrations TBD.            
Half of the day will be aircraft maintenance.  Time TBD.
Friday: 
0700-1200 Instrument access
1400-1530 Shakedown flight
1600-1700 Post flight instrument inspection
 
There will be Saturday aircraft access 0700-1700 and Sunday will be lab access only.
Monday’s science flight takeoff time is 1200.

END OF THE DAY REPORT:
DC-8:
CAFS:  Ready for calibration and inspection.
CIT-CIMS:  Calibrating.
DIAL:  Ready for Cal test tomorrow.
GT-CIMS:  Ready for power.
K-ACES:  Installed.  Ready for probe.
K-CIMS:  Ready for probe.
K-PTRMS:  Installed.  Ready for probe.
LARGE:  Wing pod installed.
 
•  Lab meeting 1300 every day except Saturday and Sunday.
 
LaRC B200: (by Lucille Crittenden) 
•  An ESRR (Experimental Systems Readiness Review) was held today and almost all of the action items were checked off; another ESRR (probably virtual) will be held in Korea after the instruments are re-installed and prior to an ICF in order to complete check-off of all ESRR items
•  Science instruments are being removed this afternoon and evening in preparation for pack-up for shipment
•  QA is continuing with closeout of action items
•  An ops check flight will be conducted tomorrow morning to allow more pilot familiarity with the new avionics
•  AirMods will arrive around mid-day tomorrow and begin installation of the external fuel tanks