Warning message

Member access has been temporarily disabled. Please try again later.
The website is undergoing a major upgrade. Until that is complete, the current site will be visible but logins are disabled.

PACE-PAX 08/31/24 Mission Daily Schedule

Labor Day Weekend (all times PDT)

Hard Down Days Saturday and Sunday - enjoy the weekend!

Monday, September 2, 2024
Meetings:
0900: Weather Briefing, Mission Status and Flight Planning Meeting (Virtual Teams meeting) for Tuesday and Wednesday

NASA ER-2
Hard Down Day

CIRPAS Twin Otter 
Hard Down Day

Tentative weekly plan
Tuesday, September 3rd: Twin Otter flight
Wednesday, September 4th: Twin Otter, possible ER-2 flight
Thursday, September 5th: Twin Otter, possible ER-2 flight (only if no Wednesday flight)
Friday, September 6th: Twin Otter, ER-2 flights
Saturday, September 7th: Hard down both aircraft
Sunday, September 8th: Resume flights
These plans will solidify as we learn more about weather
Look for details on Whatsapp for a social event tomorrow (Aug 31st)

Notes:
1. The Edwards Visitor Control Center (VCC) hours Mon – Fri 0700 – 1530 
2. Please refer to the PACE-PAX Deployment Guide for information on WhatsApp groups

Reminders:
AFRC:  Please do not take photos of the flight line or inside the hangar.
AFRC: Please use the WhatsApp FNE group to coordinate with your escorts.
AFRC and ESPO can assist with movement between the different locations.
Escorts are required in the lab, breakroom and movement between locations within the NASA Armstrong facility 7-days a week - no exceptions.
Escorts are available Monday through Friday during ER-2 access hours. Support outside these times require pre-coordination with ESPO.