PACE-PAX 09/23/24 Mission Daily Schedule
Meetings (all times PDT):
1000: Weather Briefing, Mission Status and Flight Planning Meeting (Teams Meeting)
NASA ER-2 Science Flight #9 (RF0923-ER)
0530: Instrument Hands On
0600: Preflight Science Weather Briefing (ER-2 and TO) (Teams Meeting)
0630: Mission Briefing ER-2 Go/NoGo (Teams Meeting)
*NOTE: A representative from each instrument must be present*
0630: Instrument Hands Off / ER-2 Tow out
0930: Takeoff
1300: ER-2 Weather + Ops Brief (Teams Meeting)
1600: Landing
~1645: Flight Debrief (Teams Meeting) ~45 minutes after landing
*NOTE: A representative from each instrument must be present*
1730: Access Ends
CIRPAS Twin Otter Science Flight #11
0700: Hangar Access
0700: Pilot Brief (Teams Meeting)
1000: Take Off
1400: Landing
~1435: Post Flight Brief (Teams Meeting)
RV Shearwater
*All times are approximate and may be modified based on the ship’s readiness and weather*
0815: Crew Briefing (Teams Meeting)
0900: Depart from Santa Barbara
1700: Return to Santa Barbara
UCSB Rapid Response Team
Sail Time TBD
Notes:
1. The Edwards Visitor Control Center (VCC) hours Mon – Fri 0700 – 1530
2. Please refer to the PACE-PAX Deployment Guide for information on WhatsApp groups
3. All MS Teams Meetings Links have been added to the ESPO PACE-PAX website. You must be logged in to view.
Reminders:
AFRC: Please do not take photos of the flight line or inside the hangar.
AFRC: Please use the WhatsApp FNE group to coordinate with your escorts.
AFRC and ESPO can assist with movement between the different locations.
Escorts are required in the lab, breakroom, and movement between locations within the NASA Armstrong facility 7-days a week - no exceptions.