Warning message

Member access has been temporarily disabled. Please try again later.
The website is undergoing a major upgrade. Until that is complete, the current site will be visible but logins are disabled.

PACE-PAX 09/05/24 Mission Daily Schedule

Meetings (all times PDT):
0900: Weather Briefing, Mission Status and Flight Planning Meeting (Teams Meeting

NASA ER-2  
0630: Instrument access begins
1300: ER-2 Weather and Ops Brief (Teams Meeting) 
1430: Instrument access ends
 CIRPAS Twin Otter 
0800: Hangar access

RV Shearwater
0800: Mobilization starts

UCSB Boat Sampling Day
Sail time TBD based on weather

Notes:
1. The Edwards Visitor Control Center (VCC) hours Mon – Fri 0700 – 1530 
2. Please refer to the PACE-PAX Deployment Guide for information on WhatsApp groups

Reminders:
AFRC:  Please do not take photos of the flight line or inside the hangar.
AFRC: Please use the WhatsApp FNE group to coordinate with your escorts.
AFRC and ESPO can assist with movement between the different locations.
Escorts are required in the lab, breakroom and movement between locations within the NASA Armstrong facility 7-days a week - no exceptions.