PACE-PAX 09/05/24 Mission Daily Schedule
Meetings (all times PDT):
0900: Weather Briefing, Mission Status and Flight Planning Meeting (Teams Meeting)
NASA ER-2
0630: Instrument access begins
1300: ER-2 Weather and Ops Brief (Teams Meeting)
1430: Instrument access ends
CIRPAS Twin Otter
0800: Hangar access
RV Shearwater
0800: Mobilization starts
UCSB Boat Sampling Day
Sail time TBD based on weather
Notes:
1. The Edwards Visitor Control Center (VCC) hours Mon – Fri 0700 – 1530
2. Please refer to the PACE-PAX Deployment Guide for information on WhatsApp groups
Reminders:
AFRC: Please do not take photos of the flight line or inside the hangar.
AFRC: Please use the WhatsApp FNE group to coordinate with your escorts.
AFRC and ESPO can assist with movement between the different locations.
Escorts are required in the lab, breakroom and movement between locations within the NASA Armstrong facility 7-days a week - no exceptions.