PACE-PAX 08/22/24 Mission Daily Schedule

NASA – PACE-PAX Plan of the Day
 
Thursday 22 August 2024 (all times PDT)
 
NASA ER-2 
0630 - 0830: No instrument aircraft access
0830 - 1530: Aircraft access 
 
CIRPAS Twin Otter 
The LARGE team is onsite setting up ground site observation instruments in the tower.
 
Notes:
1. The Edwards Visitor Control Center (VCC) hours Mon – Fri 0700 – 1530 
2. Please refer to the PACE-PAX Deployment Guide for information on WhatsApp groups
 
Reminders:
AFRC:  Please do not take photos of the flight line or inside the hangar
AFRC: Please use the WhatsApp FNE group to coordinate with your escorts.
AFRC and ESPO can assist with movement between the different locations.
Escorts are required in the lab, breakroom and movement between locations within the NASA Armstrong facility 7-days a week - no exceptions.
Escorts are available Monday through Friday during ER-2 access hours. Support outside these times require pre-coordination with ESPO.