OIB 11/09/18 Mission Daily Schedule

 Friday, Nov 9 FLIGHT DAY
0600 Breakfast Opens
0800 Power On
0900 Flight brief
0930 Doors close
1000 Take off

 Land Ice – Support Force-Upper Blackwall IS-2
This new flight is designed to survey the channel of Support Force and upper Blackwall Glacier, mostly
along ICESat-2 ground tracks. For these tracks, we specifically target the strong beam of each beam
pair. The cross-flow lines also address gaps in Bedmap-2 coverage.
Flight Priority: low
ICESat-2 latency: long
Science Requirements Addressed: P1,P2,IS6,IS7,IS11,IS12
Spacecraft Tracks: D1198,D0817,D0314,D1320,D0466,D1167 (all ICESat-2)
Last Flown: new flight
Remaining Design Issues: none