The website will be undergoing a major upgrade beginning Friday, October 11th at 5:00 PM PDT. The new upgraded site will be available no later than Monday, October 21st. Please plan to complete any critical activities before or after this time.

Major aircraft modification: MQ-9 "Block 1" Upgrade and Acceptance Test

Short Title: 
Block 1 Acceptance Test
Activity Category: 
Maintenance
Location: 
General Atomics ASI, Poway, CA
Details: 

The Ikhana will be receiving a major upgrade to the production avionics and flight controls from the current pre-production to a "Block 1" production configuration. This will significantly enhance the long term sustainability of the system as well as upgrade it's capabilities. For example the aircraft electrical power available to payloads will increase from ~2Kw to over 8Kw.

Date: 
Wednesday, February 1, 2012 - Friday, March 15, 2013