FIREX-AQ 07/15/19 Mission Daily Schedule

Monday, 7/15, Accomplishments
Test Flight #1 takeoff 1422 local; landing 1752
Some instrument issues.
Prof flight planned for 2000
 
Tuesday, 7/16, Plans
0630 A/C Access (after the plane is turned)
0800 Egress Training, room N131B (the room is labeled)
1030 Pre-Flight Meeting – all flyers attend. In the SARP room, S211.
1130 Doors Close
1200 SARP Flight #3 takeoff (Central Valley, Wineries, TCCON)
1700 landing
1930 A/C access ends
 
Wednesday, 7/17, Plans
0530 A/C Access (after the plane is turned)
0630 Pre-Flight Meeting for both flights. In the SARP room, S211.
0730 Doors Close
0800 SARP Flight #1 takeoff (LA Basin, TCCON) ~ 3 hours duration
1100 landing
Instruments will have power between flights.
1300 SARP Flight #2 (DMS, LA Basin) ~ 4 hours duration
1700 landing
1930 A/C Access ends
 
Thursday, 7/18, Plans
0630 A/C Access (after the plane is turned)
1230 Pre Flight Meeting room S111
1330 Doors Close
1400 Test Flight #2 Takeoff ~ 4 hours duration
1800 landing
1900 A/C Access ends (prof flight at 2000)
 
Friday, 7/19, Plans
0630 A/C Access
Pack 
1830 A/C Access ends
 
Saturday, 7/20, Plans
Pack
Access likely, TBD
 
Sunday, 7/21, Plans
Hard Down Day
 
Other:
Pre-Flight meetings are generally 90 minutes before takeoff.
See the X-chat configuration notes sent today, to configure your phone for chat.
DC-8 is now a nut-and-nut-product-free zone. 
 
Photos uploaded to the web site later (instead of attached) today
 
Bernie Luna
650 417 8810