FIREX-AQ 07/12/19 Mission Daily Schedule

Friday, 7/11, Accomplishments
People successfully navigated their way to the aircraft!
On A/C work continued
Dave Jordan departs

Saturday, 7/12, Plans
Electrical power in hangar will probably still be off.
A/C access via the same route as Friday (Go through
VCC, enter hangar via pedestrian door on southeast
corner, walk into hangar and then to A/C)
Bernadette Luna arrives
07:00    A/C access begins
14:00    A/C access ends

The A/C is currently under weight control so the weight of any equipment brought on
or taken off of the A/C needs to be recorded on the “Weight Control Log” on the wall
on the left just inside the A/C door.