ATTREX 02/17/15 Mission Daily Schedule

Overview:

  • MMS and GHOST wiring issues resolved, outdoor Satcom Testing continues tomorrow.
  • Expectation of Pre-CST by COB tomorrow.
  • P.I.’s - see arrival schedule below to support testing and Pre-CST

Accomplishments:

  • NGC reports CAST/ATTREX payload passes shear-bending analysis
  • GHOST Cryostat cool-down and re-installation on aircraft
  • MMS wiring and GHOST IT issues resolved
  • Tech Brief Slide run-through
  • Weekly CAST/ATTREX Leads Telecom

Issues/Watch items:

  • MMS wiring issue required all day to resolve – no outdoor Satcom Testing accomplished today.

Upcoming Schedule:

Wednesday:

  • Crew to stage aircraft at normal Ku-testing location, ready for power at 0730
  • MMS, GHOST, AIITS & Hawkeye: please report to GHOC at 0730
  • O3, NWV, MTP & GWAS: please report to Payload Cage at 0900 (You’ll be called to GHOC as needed by Caitlin)
  • Aircraft outdoor testing all day hopefully concluded with Pre-CST.

Thursday:

  • Maint and Avionics aircraft final prep for CST

Friday:

  • All personnel participate in CST: Schedule TBA