The website is undergoing a major upgrade. Until that is complete, the current site will be visible but logins are disabled.
NOAA and NASA Scientists of PACE-PAX at Marina Airport
PACE-PAX 09/11/24 Mission Daily Schedule
Meetings (all times PDT):
1000: Weather Briefing, Mission Status and Flight Planning Meeting (Teams Meeting)
R/V Blissfully Makes Waves in Southern California
NASA Earth Scientists Take Flight, Set Sail to Verify PACE Satellite Data
NASA - More than 100 scientists will participate in a field campaign involving a research vessel and two aircraft this month to verify the accuracy of data collected by NASA’s new PACE satellite: the Plankton, Aerosol, Cloud, ocean Ecosystem mission.
UCSB Rapid Response Team at Santa Barbara Harbor
PACE-PAX 09/10/24 Mission Daily Schedule
Meetings (all times PDT):
1000: Weather Briefing, Mission Status and Flight Planning Meeting (Teams Meeting)
PACE-PAX 09/09/24 Mission Daily Schedule
NASA – PACE-PAX Plan of the Day
Monday, September 9, 2024 (all times PDT)
Meetings:
0900: Shearwater RF0908 debrief
1000: Weather Briefing, Mission Status and Flight Planning Meeting
NASA ER-2 Science
0700: Instrument access begins
1300: ER-2 Weather and Ops Brief
1500: Instrument access ends
CIRPAS Twin Otter
0800: Hangar access
RV Shearwater
No operations
PACE-PAX Operations at Santa Barbara Harbor
PACE-PAX 09/08/24 Mission Daily Schedule
NASA – PACE-PAX Plan of the Day
Sunday, September 8, 2024 (all times PDT)
Meetings:
0700: Preflight Science Weather Briefing (ER-2 & TO) (Teams Meeting)
1000: Weather Briefing, Mission Status and Flight Planning Meeting (Teams Meeting)
NASA ER-2 Science Flight #3 (RF0908-ER)
0730: Instrument Hands On
0820: Mission Briefing ER-2 Go/No-Go (Teams Meeting)
*NOTE: A representative from each instrument must be present*
PACE-PAX 09/07/24 Mission Daily Schedule
NASA – PACE-PAX Plan of the Day
Saturday, September 7, 2024 (all times PDT)
Meetings:
0830: Preflight Science Weather Briefing (TO Only) (Teams Meeting)
1000: Weather Briefing, Mission Status and Flight Planning Meeting (Teams Meeting)
NASA ER-2
Hard Down Day
CIRPAS Twin Otter Science Flight #4 (RF0907-TO)
0900: Pilot Brief (Teams Meeting)
1200: Takeoff
1630: Land
1700: Post Flight Brief (Teams Meeting)
Pages