Associated content: 
Sub-categories: 

HIRAD radome install on AV-1 (9.27.12)

HIRAD radome install on AV-1 (9.27.12)

HIRAD fairing install on AV-1 (9.27.12)

HIRAD fairing install on AV-1 (9.27.12)

HIRAD fairing install on AV-1 (9.27.12)

HIRAD fairing install on AV-1 (9.27.12)

AVAPS and CPL teams in the Payload Mobile Operations Facility (Sep 2012)

AVAPS and CPL teams in the Payload Mobile Operations Facility (Sep 2012)

Deputy Principal Investigator Paul Newman in the Payload Mobile Operations Facility (Sep 2012)

Deputy Principal Investigator Paul Newman in the Payload Mobile Operations Facility (Sep 2012)

HS3 09/27/12 Daily Schedule

WFF: All times EDT

Friday, 9/28
0800-1000 AV-6 aircraft instrument access
1030 Debrief from 9/26-27 flight
No forecasting briefings

Saturday, 9/29
Work day for all except pilots (pilot down day)
Possible AV-1 support activities from PMOF -- Ku, IT, AV-1 instruments

Next possible flight Tuesday, 10/2

DFRC: All times PDT

Friday, 9/28
AV-1 final avionics work and power on aircraft

Saturday, 9/29
Possible AV-1 activity

Weather Channel coverage of HS3 (9.27.12)

Weather Channel coverage of HS3 (9.27.12)

Weather Channel coverage of HS3 (9.27.12)

Weather Channel coverage of HS3 (9.27.12)

Discovery Channel prepares to film AV-6 in 3-D (9.27.12)

Discovery Channel prepares to film AV-6 in 3-D (9.27.12)

Sunrise over PMOF and GHMOF awaiting AV-6 landing (9.27.12)

Sunrise over PMOF and GHMOF awaiting AV-6 landing (9.27.12)

Pages

Subscribe to RSS - HS3