Associated content: 

From left: Xiaoli Shen, Justin Jacquot, Mike Kapitzke & Dan Cziczo

DCOTSS 05/20/21 Mission Daily Schedule

0700 - 1500 ER2 crew support
0700 - 1700 FN Support

PALMS
Successful receiving status data packets from the aircraft
Working software updates

UCATS
Made excellent progress, finishing all possible integration work

DPOPS
Instrument bench work, calibration
Working with AFRC safety to bring in calibration

CAFE/CANOE/ROZE
Good progress mechanical integration work

DCOTSS 05/19/21 Mission Daily Schedule

0700 - 1500 ER2 Crew support
0700 - Lab access with FN escort (3 FN escorts needed)
1300 - Navigation data check 
 
PALMS
Working software updates and calibration.
 
UCATS
Mostly finished integration.
Need to route inlet lines from bottom rack to the top rack. This will be completed after HUPCRS arrives for integration.
 
CAFE/CANOE/ROZE
Weight and balance done.
Troubleshooting ROZE power configuration.
 
ER2

DCOTSS 05/18/21 Mission Daily Schedule

  • 0700 - 1500 ER2 crew support
  • 0700 Lab Access
  • Two designated FN escorts and one backup needed

Mike (Litch) Litchfield, Yaowei Li, Xiaoli Shen, Dan Cziczo & Justin Jacquot

Justin Jacquot, Xiaoli Shen & Dan Cziczo

DCOTSS 05/15/21 Mission Daily Schedule

0800 - 1200 DPOPS, Lab access, with escort.
 
It's been another productive day. Accomplishments:
 
UCATS

  • Drill-matched the aircraft mount frame
  • Finished lab set up
  • Calibration work

PALMS

  • Finished laser calibration

DPOPS

Pages

Subscribe to RSS - DCOTSS