Synonyms: 
Atmospheric Tomography Mission
Associated content: 

ATom 07/06/16 Mission Daily Schedule

ATom Plan of the Day

Wednesday, 6 July

  • AO2/Medusa completed installation and power checks
  • MMS essentially completed installation and power checks
  • CAPS changed a transistor and resistor on their circuit board and the instrument is operating well

Thursday, 7 July

  • 09:00: Aircraft pressure check outside (nlt 09:00)
  • Aircraft access ~30 minutes after pressure check
  • 08:00-13:15 Media Day

Upcoming:

  • 8 July  (morning) - Aircraft weight and balance

ATom 07/05/16 Mission Daily Schedule

Tuesday, 5 July

  • 0630 - 1730: Aircraft access
  • WAS snakes installed; leak check in progress
  • CAPS performing off-aircraft calibration

Wednesday, 6 July

  • 0630 - 1730: Aircraft access
  • AO2/Medusa returns to finalize instrument installation and perform power check
  • ISAF installation

Upcoming:

  • 8 July - Aircraft weight and balance

Eric, Tom, and Chelsea [07.01.16]

ATom 07/01/16 Mission Daily Schedule

ATom Plan of the Day for July 2-4, 2016:

Saturday, 2 July

  • 0700 - 1500: Aircraft access

Upcoming

  • 3-4 July - Lab access only. No aircraft access.
  • 5 July - CIT-CIMS and WAS teams arrive Bldg 703.
  • 6 July - ISAF team arrives Bldg 703.

DC-8 cabin c. 2016 [06.30.16]

ATom 06/30/16 Mission Daily Schedule

ATom Plan of the Day for July 1, 2016:

Friday, 1 July

  • 0700 - 1500: Aircraft access

Upcoming

  • 2 July - Aircraft access hours are 0700 - 1500. Visitor Control office closed.
  • 3-4 July - Lab access only. No aircraft access.
  • 5 July - CIT-CIMS, ISAF and WAS teams arrive Bldg 703.

Adam Webster, Terrence Dilworth and Paul Bui [06.29.16]

Andy Watt and Eric Hintsa [06.29.16]

ATom 06/29/16 Mission Daily Schedule

ATom Plan of the Day for June 30, 2016:

Thursday, 30 June

  • 0630 - 1730: Aircraft access
  • 0700 - 1430: Visitor Control (Badging) office is open - Bring two forms of ID
  • 1300: Science upload meeting in the Lab
  • 1400: Egress training

Upcoming

  • 1-2 July - Aircraft access hours are 0700 - 1500. Visitor Control office closed.
  • 3-4 July - Lab access only. No aircraft access.
  • 5 July - CIT-CIMS, ISAF, SAGA and WAS teams arrive Bldg 703.

David, Fred and Kathryn [06.28.16]

Pages

Subscribe to RSS - ATom