Download current revision of this file
WISPER_P3_20170904.ict
- Mission: ORACLES, ORACLES-2 Deployment (8/1/2017-9/4/2017; Mission Website)
- Measurement Platform: P-3 Orion aircraft (Aircraft Webpage)
- Measurement Date: 20170904 (Mon, Sep 4, 2017) (Flight Report)
- File Code: WISPER, P3
- Measurement PI: Noone
- Description: Total water and cloud water with isotope ratios
- File Format: Archive (plain-text) data file in ICARTT format
- Current Revision
Revision History
Revision | Size | Uploaded |
---|---|---|
R1 | 3.3 MB | Tue, May 22, 2018 |
R0 | 2.4 MB | Fri, Sep 15, 2017 |