Download current revision of this file
UP20000311.ER2
- Mission: SOLVE (11/10/1998-3/31/2000; Mission Website)
- Measurement Platform: ER-2 aircraft (Aircraft Webpage)
- Measurement Date: 20000311 (Sat, Mar 11, 2000)
- Current Revision: R0
- File Code: UP, ER2
- Measurement PI: McElroy
- Description: CPFM albedo
- Instrument: CPFM
- File Format: Archive (plain-text) data file in Ames format
Revision History
Revision | Size | Uploaded |
---|---|---|
R0 | 21.95 KB | Sat, Mar 11, 2000 |