Download current revision of this file
UND-2DS_P3_20160925.ict
- Mission: ORACLES, ORACLES-1 Deployment (8/19/2016-10/27/2016; Mission Website)
- Measurement Platform: P-3 Orion aircraft (Aircraft Webpage)
- Measurement Date: 20160925 (Sun, Sep 25, 2016) (Flight Report)
- File Code: UND-2DS, P3
- Measurement PI: Poellot
- Description: SPEC Two-Dimensional Stereo Optical Array Probe
- File Format: Archive (plain-text) data file in ICARTT format
- Current Revision
Revision History
Revision | Size | Uploaded |
---|---|---|
R1 | 8.07 MB | Fri, Jun 30, 2017 |
R0 | 8.07 MB | Tue, Apr 11, 2017 |