Download current revision of this file
SAGA-MC_DC8_20180424.ict
- Mission: ATom, ATom-4 Deployment (4/24/2018-5/21/2018; Mission Website)
- Measurement Platform: DC-8 aircraft (Aircraft Webpage)
- Measurement Date: 20180424 (Tue, Apr 24, 2018) (Flight Report)
- File Code: SAGA-MC, DC8
- Measurement PI: Dibb
- Description: UNH Mist Chamber measuremets
- Instrument: SAGA
- File Format: Archive (plain-text) data file in ICARTT format
- Current Revision
Revision History
Revision | Size | Uploaded |
---|---|---|
R1 | 15.45 KB | Thu, Nov 29, 2018 |
R0 | 15.35 KB | Thu, Apr 26, 2018 |