Download current revision of this file
PDI-CDNC_P3_20170815.ict
- Mission: ORACLES, ORACLES-2 Deployment (8/1/2017-9/4/2017; Mission Website)
- Measurement Platform: P-3 Orion aircraft (Aircraft Webpage)
- Measurement Date: 20170815 (Tue, Aug 15, 2017) (Flight Report)
- File Code: PDI-CDNC, P3
- Measurement PI: Griswold
- Description: Flight Probe Dual Range Phase Doppler Interferometer Data
- File Format: Archive (plain-text) data file in ICARTT format
- Current Revision
Revision History
Revision | Size | Uploaded |
---|---|---|
R1 | 8.24 MB | Tue, Aug 28, 2018 |
R0 | 8.24 MB | Fri, Apr 27, 2018 |