Download current revision of this file
OU-2DS-V_P3_20180927.nc
- Mission: ORACLES, ORACLES-3 Deployment (9/21/2018-10/27/2018; Mission Website)
- Measurement Platform: P-3 Orion aircraft (Aircraft Webpage)
- Measurement Date: 20180927 (Thu, Sep 27, 2018) (Flight Report)
- Current Revision: R0
- File Code: OU-2DS-V, P3
- Measurement PI: Poellot
- Description: SPEC Two-Dimensional Stereo Optical Array Probe - Vertical Channel
- File Format: Binary data file in NetCDF-3 (classic NetCDF) format
Revision History
Revision | Size | Uploaded |
---|---|---|
R0 | 77.11 MB | Mon, Jun 14, 2021 |