Download current revision of this file
GMI4D_DC8_20160729.nc
- Mission: ATom, ATom-1 Deployment (7/29/2016-8/23/2016; Mission Website)
- Measurement Platform: DC-8 aircraft (Aircraft Webpage)
- Measurement Date: 20160729 (Fri, Jul 29, 2016) (Flight Report)
- File Code: GMI4D, DC8
- Measurement PI: Strode
- Description: GMI CTM hindcast with 4D grid bounding flight path: gas-phase chemistry (40 species) at: ¼ hr, 1° latitude, 1.25° longitude, standard model levels
- File Format: Binary data file in NetCDF-4 (HDF-5 compatible) format
- Current Revision
Revision History
Revision | Size | Uploaded |
---|---|---|
R2 | 136.36 MB | Thu, Nov 1, 2018 |
R1 | 136.32 MB | Thu, Jul 19, 2018 |
R0 | 136.32 MB | Fri, May 12, 2017 |