Download current revision of this file
GC19991211.ER2
- Mission: SOLVE (11/10/1998-3/31/2000; Mission Website)
- Measurement Platform: ER-2 aircraft (Aircraft Webpage)
- Measurement Date: 19991211 (Sat, Dec 11, 1999)
- File Code: GC, ER2
- Measurement PI: Elkins
- Description: ACATS measurements
- Instrument: ACATS
- File Format: Archive (plain-text) data file in Ames format
- Current Revision
Revision History
Revision | Size | Uploaded |
---|---|---|
R1 | 26.96 KB | Tue, Aug 1, 2000 |
R0 | Wed, Dec 15, 1999 |