Download current revision of this file
DB20030119.DC8
- Mission: SOLVE II (12/1/2002-1/10/2004; Mission Website)
- Measurement Platform: DC-8 aircraft (Aircraft Webpage)
- Measurement Date: 20030119 (Sun, Jan 19, 2003)
- File Code: DB, DC8
- Measurement PI: Shetter
- Description: DIAS irradiance,optical depth vs t
- Instrument: DIAS
- File Format: Archive (plain-text) data file in Ames format
- Current Revision
Revision History
Revision | Size | Uploaded |
---|---|---|
R2 | 1.14 MB | Tue, Feb 25, 2003 |
R1 | Thu, Jan 23, 2003 | |
R0 | Wed, Jan 22, 2003 |