Download current revision of this file
CS20020703__WV.ER2
- Mission: CRYSTAL-FACE (5/3/2002-7/31/2002; Mission Website)
- Measurement Platform: ER-2 aircraft (Aircraft Webpage)
- Measurement Date: 20020703 (Wed, Jul 3, 2002)
- Current Revision: R0
- File Code: CS__WV, ER2
- Measurement PI: Wang_J
- Description: CoSSIR nadir water vapor vs z,t
- Instrument: CoSSIR
- File Format: Archive (plain-text) data file in Ames format
Revision History
Revision | Size | Uploaded |
---|---|---|
R0 | 277.32 KB | Mon, Jul 22, 2002 |