Download current revision of this file
BT19960423.ER2
- Mission: SUCCESS (4/2/1996-5/16/1996; Mission Website)
- Measurement Platform: ER-2 aircraft (Aircraft Webpage)
- Measurement Date: 19960423 (Tue, Apr 23, 1996)
- Current Revision: R0
- File Code: BT, ER2
- Measurement PI: Wang
- Description: MIR nadir brightness T
- Instrument: MIR
- File Format: Archive (plain-text) data file in Ames format
Revision History
Revision | Size | Uploaded |
---|---|---|
R0 | 395.72 KB | Wed, Mar 5, 1997 |