Download current revision of this file
mrg60_ER2_20160826.nc
- Mission: ORACLES, ORACLES-1 Deployment (8/19/2016-10/27/2016; Mission Website)
- Measurement Platform: ER-2 aircraft (Aircraft Webpage)
- Measurement Date: 20160826 (Fri, Aug 26, 2016) (Flight Report)
- File Code: mrg60, ER2
- Measurement PI: Shinozuka
- Description: Some variables merged into a 60s-interval time array
- File Format: Binary data file in NetCDF-4 (HDF-5 compatible) format
- Current Revision
Revision History
Revision | Size | Uploaded |
---|---|---|
R1 | 191.7 KB | Wed, May 10, 2017 |
R0 | 191.69 KB | Wed, Apr 5, 2017 |