Download current revision of this file
XS20050114.DC8
- Mission: PAVE (1/14/2005-2/9/2005; Mission Website)
- Measurement Platform: DC-8 aircraft (Aircraft Webpage)
- Measurement Date: 20050114 (Fri, Jan 14, 2005)
- File Code: XS
- Measurement PI: Lait
- Description: GSFC met X-section along flt track
- File Format: Archive (plain-text) data file in Ames format
- Current Revision
Revision History
Revision | Size | Uploaded |
---|---|---|
R1 | 74.58 KB | Fri, Jan 28, 2005 |
R0 | Thu, Jan 27, 2005 |