Download current revision of this file
UP19961206.ER2
- Mission: STRAT (3/24/1995-12/20/1996; Mission Website)
- Measurement Platform: ER-2 aircraft (Aircraft Webpage)
- Measurement Date: 19961206 (Fri, Dec 6, 1996)
- Current Revision: R0
- File Code: UP, ER2
- Measurement PI: McElroy
- Description: CPFM albedo
- Instrument: CPFM
- File Format: Archive (plain-text) data file in Ames format
Revision History
Revision | Size | Uploaded |
---|---|---|
R0 | 16.89 KB | Tue, Jun 3, 1997 |