Download current revision of this file
PR20020725.PARSL
- Mission: CRYSTAL-FACE (5/3/2002-7/31/2002; Mission Website)
- Measurement Platform: Ground
- Measurement Date: 20020725 (Thu, Jul 25, 2002)
- Current Revision: R0
- File Code: PR, Ground
- Measurement PI: Drdla
- Description: Proximity of aircraft to PARSL
- File Format: Archive (plain-text) data file in Ames format
Revision History
Revision | Size | Uploaded |
---|---|---|
R0 | 68.96 KB | Sat, Jul 27, 2002 |