Download current revision of this file
PI19960420__1.DC8
- Mission: SUCCESS (4/2/1996-5/16/1996; Mission Website)
- Measurement Platform: DC-8 aircraft (Aircraft Webpage)
- Measurement Date: 19960420 (Sat, Apr 20, 1996)
- File Code: PI__1, DC8
- Measurement PI: Lawson
- Description: PI Nephelometer 1 second derived products
- File Format: Archive (plain-text) data file in Ames format
- Current Revision
Revision History
| Revision | Size | Uploaded |
|---|---|---|
| R2 | 3.01 MB | Fri, Dec 19, 1997 |
| R1 | Thu, Oct 30, 1997 | |
| R0 | Wed, Oct 29, 1997 |
