Download current revision of this file
GMI_DC8_20180509.ict
- Mission: ATom, ATom-4 Deployment (4/24/2018-5/21/2018; Mission Website)
- Measurement Platform: DC-8 aircraft (Aircraft Webpage)
- Measurement Date: 20180509 (Wed, May 9, 2018) (Flight Report)
- File Code: GMI, DC8
- Measurement PI: Strode
- Description: GMI full chemistry CTM hindcast: gas-phase chemistry (40 species) along 10-sec merge, interpolated to the flight track
- File Format: Archive (plain-text) data file in ICARTT format
- Current Revision
Revision History
Revision | Size | Uploaded |
---|---|---|
R1 | 2.61 MB | Fri, Oct 19, 2018 |
R0 | 2.61 MB | Thu, Sep 20, 2018 |