Download current revision of this file
GMI4D_DC8_20180501.nc
- Mission: ATom, ATom-4 Deployment (4/24/2018-5/21/2018; Mission Website)
- Measurement Platform: DC-8 aircraft (Aircraft Webpage)
- Measurement Date: 20180501 (Tue, May 1, 2018) (Flight Report)
- Current Revision: R0
- File Code: GMI4D, DC8
- Measurement PI: Strode
- Description: GMI CTM hindcast with 4D grid bounding flight path: gas-phase chemistry (40 species) at: ¼ hr, 1° latitude, 1.25° longitude, standard model levels
- File Format: Binary data file in NetCDF-4 (HDF-5 compatible) format
Revision History
Revision | Size | Uploaded |
---|---|---|
R0 | 380.51 MB | Fri, Oct 26, 2018 |