Download current revision of this file
GMI4D_DC8_20171027.nc
- Mission: ATom, ATom-3 Deployment (9/26/2017-10/27/2017; Mission Website)
- Measurement Platform: DC-8 aircraft (Aircraft Webpage)
- Measurement Date: 20171027 (Fri, Oct 27, 2017) (Flight Report)
- File Code: GMI4D, DC8
- Measurement PI: Strode
- Description: GMI CTM hindcast with 4D grid bounding flight path: gas-phase chemistry (40 species) at: ¼ hr, 1° latitude, 1.25° longitude, standard model levels
- File Format: Binary data file in NetCDF-4 (HDF-5 compatible) format
- Current Revision
Revision History
Revision | Size | Uploaded |
---|---|---|
R2 | 272.6 MB | Fri, Nov 2, 2018 |
R1 | 272.56 MB | Thu, Aug 23, 2018 |
R0 | 282.3 MB | Thu, Jan 25, 2018 |