Download current revision of this file
GCECD_DC8_20160812.ict
- Mission: ATom, ATom-1 Deployment (7/29/2016-8/23/2016; Mission Website)
- Measurement Platform: DC-8 aircraft (Aircraft Webpage)
- Measurement Date: 20160812 (Fri, Aug 12, 2016) (Flight Report)
- File Code: GCECD
- Measurement PI: Elkins
- Description: PANTHER GC electron capture channels
- Instrument: PANTHER
- File Format: Archive (plain-text) data file in ICARTT format
- Current Revision
Revision History
Revision | Size | Uploaded |
---|---|---|
R1 | 77.09 KB | Wed, Jul 19, 2017 |
R0 | 96.15 KB | Sat, Aug 13, 2016 |