Download current revision of this file
GC19970509.ER2
- Mission: POLARIS (10/29/1996-10/29/1997; Mission Website)
- Measurement Platform: ER-2 aircraft (Aircraft Webpage)
- Measurement Date: 19970509 (Fri, May 9, 1997)
- File Code: GC, ER2
- Measurement PI: Elkins
- Description: ACATS measurements
- Instrument: ACATS
- File Format: Archive (plain-text) data file in Ames format
- Current Revision
Revision History
Revision | Size | Uploaded |
---|---|---|
R3 | 15.02 KB | Wed, Sep 9, 1998 |
R2 | Thu, Mar 12, 1998 | |
R1 | Fri, Mar 6, 1998 | |
R0 | Fri, May 9, 1997 |